World Power Plants

Madinat Zayed Power Station108.5 MW 天然ガス

Gas検証日: 2026年2月

Madinat Zayed Power Station is a gas-fired power plant in the United Arab Emirates with a capacity of 108.5 MW, operated by Al Mirfa Power Company. This facility is part of the UAE's energy infrastructure. Ranked as the 47th largest gas plant in the UAE, it represents 0.14% of the country’s total gas capacity of 78,266 MW. The UAE has 52 gas plants with a combined capacity of 78,266 MW. In comparison to the largest gas plant, محطة كهرباء جبل علي at 9,547 MW, Madinat Zayed is about 1/88th the size. Natural gas is the primary fuel source for electricity generation in the UAE, accounting for approximately 95% of the country's power generation. The UAE's strategic location and abundant natural gas reserves support its energy needs. The plant is situated in the western region of Abu Dhabi, approximately 150 km from the capital city.

発電容量
108.5 MW
運転開始年
2010

16 年経過

所有者
Al Mirfa Power Company
所在地
23.5797°, 53.7296°

アラブ首長国連邦, Asia

位置づけとランキング
  • アラブ首長国連邦の81か所中57番目の規模
  • 設備容量で世界第9,704位
  • 世界の天然ガス発電所5,146か所中第3,205位
  • アラブ首長国連邦の設備容量の0.12%
稼働年数と設備群の比較

稼働16年

天然ガス設備群の平均:26.9年

事業者のポートフォリオ

Al Mirfa Power Companyは1か所・計109 MWを運営

地域の集積

半径100 km以内に9か所・合計4,435 MW

最寄りの発電所:Shams(1.8 km)

データの出所

所在地

座標:: 23.579727, 53.729582
Googleマップで開く
カーボンフットプリント490 g CO₂/kWh
年間CO₂
209.6 Kt
428 GWh/year × 490 g/kWh
累積CO₂
3.35 Mt
16年間の稼働にわたって
廃止予定(推定)
2040
残り14年
年間排出量は次に相当します
45.6K
台の自動車(年間)
27.9K
軒の住宅(年間)
9.5M
本の樹木で相殺

この推定値はGasの排出係数(490 g CO₂/kWh)と設備利用率(45%)に基づいています。実際の排出量は、稼働条件・効率・燃料品質によって変動する場合があります。

技術詳細

主燃料タイプ
Gas
エネルギー源
非再生可能
アラブ首長国連邦
大陸
Asia
データソース
グローバル発電所データベース

アラブ首長国連邦エネルギープロファイル

81
発電所総数
93.9 GW
総発電容量
GasNuclearSolar
主要燃料

不正確または欠けているデータがありますか?

修正や更新を報告してデータベースの改善にご協力ください。あなたの貢献がグローバル発電所データを正確かつ最新に保つのに役立ちます。