Central termoeléctrica Felipe Carrillo Puerto holds the 168th position among Mexico's 419 power generation facilities, with a generation capacity of 220 MW, accounting for 0.16% of the nation's total capacity of 141,268 MW. This facility, commissioned in 1989, utilizes advanced gas-fired technology, contributing to a cleaner energy output compared to older generation methods. The region is not without competition, as it is surrounded by larger gas plants like Valladolid III and its combined cycle counterpart, both generating 525 MW each. These neighboring facilities represent a significant portion of the local energy landscape, emphasizing the strategic importance of Felipe Carrillo Puerto in balancing the grid's energy supply. Despite its lower capacity in comparison to nearby plants, Felipe Carrillo Puerto serves a crucial role in supporting the region's energy needs, especially given Mexico's reliance on gas as the dominant fuel source. With a national average capacity of around 337 MW per plant, Felipe Carrillo Puerto's output is typical yet underscores the importance of each facility in maintaining overall grid reliability. The management of this power generation facility reflects a commitment to sustainable practices in an evolving energy market. Looking toward the future, Central termoeléctrica Felipe Carrillo Puerto is poised to enhance its operational efficiency and contribute to Mexico's goals of increasing renewable energy integration while continuing to provide essential power to local communities.
37 年経過
メキシコ, North America
- メキシコの419か所中169番目の規模
- 設備容量で世界第7,071位
- 世界の天然ガス発電所5,146か所中第2,575位
- メキシコの設備容量の0.16%
稼働37年
天然ガス設備群の平均:26.9年
Comisión Federal de Electricidad (CFE)は3か所・計593 MWを運営
半径100 km以内に3か所・合計1,270 MW
出典: OpenStreetMap
所在地
この推定値はGasの排出係数(490 g CO₂/kWh)と設備利用率(45%)に基づいています。実際の排出量は、稼働条件・効率・燃料品質によって変動する場合があります。
技術詳細
- 主燃料タイプ
- Gas
- エネルギー源
- 非再生可能
- 国
メキシコ- 大陸
- North America
- データソース
- グローバル発電所データベース
近くの発電所
不正確または欠けているデータがありますか?
修正や更新を報告してデータベースの改善にご協力ください。あなたの貢献がグローバル発電所データを正確かつ最新に保つのに役立ちます。