World Power PlantsWorld Power Plants

Gopalganj Peaking109 MW Oil

Oil

Gopalganj Peaking adalah pembangkit listrik tenaga minyak yang terletak di Bangladesh. Pembangkit ini memiliki kapasitas terpasang sebesar 109 MW yang dihasilkan dari energi minyak.

Kapasitas
109 MW
Tahun Beroperasi
2010

16 tahun

Pemilik
Bangladesh Power Development Board
Lokasi
23.9797°, 90.6370°

Bangladesh, Asia

Lokasi

Koordinat:: 23.979700, 90.637000
Buka di Google Maps
Carbon Footprint650 g CO₂/kWh
Annual CO₂
217.2 Kt
334 GWh/year × 650 g/kWh
Cumulative CO₂
3.48 Mt
Over 16 years of operation
Est. Retirement
2040
14 years remaining
Annual emissions equivalent to
47.2K
cars per year
29.0K
homes per year
9.9M
trees to offset

Estimates based on Oil emission factor (650 g CO₂/kWh) and capacity factor (35%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.

Detail Teknis

Jenis Bahan Bakar Utama
Oil
Sumber Energi
Tidak Terbarukan
Negara
Bangladesh
Benua
Asia
Sumber Data
Basis Data Pembangkit Listrik Global

BangladeshProfil Energi

57
Total Pembangkit
11.8 GW
Total Kapasitas
GasOilCoalHydro
Bahan Bakar Teratas

Minyak Sebagai Sumber Energi dalam Sektor Pembangkitan Energi

Minyak, sebagai salah satu sumber energi utama di dunia, memiliki peran yang sangat signifikan dalam sektor pembangkitan energi. Sejak awal abad ke-20, minyak telah menjadi bahan bakar utama dalam berbagai aplikasi, mulai dari transportasi hingga pembangkit listrik. Keberadaan minyak bumi tidak hanya mengubah wajah industri energi, tetapi juga mempengaruhi pertumbuhan ekonomi global dan dinamika geopolitik.

Melihat Data yang Salah atau Tidak Lengkap?

Bantu kami meningkatkan database dengan melaporkan koreksi atau pembaruan. Kontribusi Anda membantu menjaga data pembangkit listrik global kami tetap akurat dan terkini.