Phase 4 - Parabolic Trough 2200 MW Solaire

SolarRenouvelableVérifié: févr. 2026

Ranked as the 50th largest power generation facility in the United Arab Emirates, the Phase 4 - Parabolic Trough 2 stands out as a significant contributor to the nation's solar energy landscape, boasting a capacity of 200 MW. This facility is particularly notable as the 7th largest solar plant among 22 solar installations in the country, representing a modest but meaningful 0.21% of the UAE's total capacity of 97,291 MW. The UAE's energy profile is predominantly gas-based, with natural gas dominating its energy mix, which highlights the importance of diversifying into renewable sources like solar. The Parabolic Trough 2 utilizes advanced solar thermal technology, specifically parabolic trough collectors that concentrate sunlight to produce steam, which then drives a turbine to generate electricity. This method not only enhances efficiency but also aligns with global trends toward sustainable energy practices. Located within a vibrant energy cluster, the plant is surrounded by several significant gas-powered facilities, including the Jebel Ali Power Station, which has a capacity of 9,547 MW, and the Jebel Ali Power and Desalination Plant, with 8,694.1 MW. These nearby plants underscore the regional reliance on fossil fuels, making Phase 4 - Parabolic Trough 2 a critical player in the transition to a more sustainable energy future. Its proximity to the Mohammed bin Rashid Al Maktoum Solar Park, the largest solar facility in the region with a capacity of 2,427 MW, further emphasizes this plant's role in the UAE's ambitious renewable energy goals. Operated by a consortium focused on advancing solar technology, this facility was commissioned to bolster the UAE's energy diversification strategy. Looking ahead, the Phase 4 - Parabolic Trough 2 is poised to play an essential role in the UAE's efforts to reduce carbon emissions and enhance energy security, contributing to the broader global shift towards clean energy solutions.

Capacité
200 MW
Année de Mise en Service
2013

13 ans d'ancienneté

Propriétaire
Abu Dhabi Water and Electricity Authority
Emplacement
24.7370°, 55.4622°

Émirats Arabes Unis, Asia

Contexte et classement
  • 50e plus grande des 81 centrales de Émirats Arabes Unis
  • N° 7 393 mondial par puissance installée
  • N° 123 sur 11 042 centrales Solaire dans le monde
  • 0,21% de la puissance installée de Émirats Arabes Unis
Âge et comparaison du parc

13 ans d'exploitation

Moyenne du parc Solaire : 10,4 ans

Portefeuille de l'exploitant

Abu Dhabi Water and Electricity Authority exploite 9 centrales totalisant 8 266 MW

Densité régionale
Provenance des données

Emplacement

Coordonnées :: 24.736951, 55.462234
Ouvrir dans Google Maps
Empreinte carbone

Zéro émission directe

Phase 4 - Parabolic Trough 2 est une centrale solar produisant environ 315 GWh d'électricité propre par an, sans émission directe de CO₂ pendant son exploitation.

Émissions sur le cycle de vie : ~41 g CO₂/kWh (fabrication, transport, démantèlement)

Détails Techniques

Type de Combustible Principal
Solar
Source d'Énergie
Renouvelable
Pays
Émirats Arabes Unis
Continent
Asia
Source des Données
Base de Données Mondiale des Centrales Électriques

Émirats Arabes UnisProfil Énergétique

81
Total des Centrales
93.9 GW
Capacité Totale
GasNuclearSolar
Principaux Combustibles

Vous Voyez des Données Incorrectes ou Manquantes ?

Aidez-nous à améliorer notre base de données en signalant toute correction ou mise à jour. Votre contribution aide à maintenir nos données mondiales sur les centrales électriques exactes et à jour.