Phase 1— 13 MW Solaire
Phase 1 is a 13 MW solar power plant in the United Arab Emirates, operated by Dubai Electricity & Water Authority (DEWA) since its commissioning. Ranked #13 of 22 solar plants in the United Arab Emirates, this facility contributes 0.17% of the country's total solar capacity of 7,825 MW. The largest solar plant in the United Arab Emirates is مجمع محمد بن راشد آل مكتوم للطاقة الشمسية at 2,427 MW, making Phase 1 186 times smaller. Nearby plants include محطة كهرباء جبل علي (Gas, 9,547 MW), Jebel Ali Power and Desalination Plant (Gas, 8,694.1 MW), and Emirates Global Aluminium Jebel Ali power plant (Gas, 2,950 MW). The facility is located in Dubai, approximately 35 km southwest of the city center.
5 ans d'ancienneté
Émirats Arabes Unis, Asia
- 62e plus grande des 81 centrales de Émirats Arabes Unis
- N° 22 124 mondial par puissance installée
- N° 3 258 sur 11 039 centrales Solaire dans le monde
- 0,01% de la puissance installée de Émirats Arabes Unis
5 ans d'exploitation
Moyenne du parc Solaire : 10,4 ans
Dubai Electricity & Water Authority (DEWA) exploite 1 centrales totalisant 13 MW
51 centrales dans un rayon de 100 km, 64 147 MW au total
Source: OpenStreetMap
Emplacement
Zéro émission directe
Phase 1 est une centrale solar produisant environ 20 GWh d'électricité propre par an, sans émission directe de CO₂ pendant son exploitation.
Émissions sur le cycle de vie : ~41 g CO₂/kWh (fabrication, transport, démantèlement)
Détails Techniques
- Type de Combustible Principal
- Solar
- Source d'Énergie
- Renouvelable
- Pays
Émirats Arabes Unis- Continent
- Asia
- Source des Données
- Base de Données Mondiale des Centrales Électriques
Émirats Arabes Unis — Profil Énergétique
Centrales Électriques à Proximité
Vous Voyez des Données Incorrectes ou Manquantes ?
Aidez-nous à améliorer notre base de données en signalant toute correction ou mise à jour. Votre contribution aide à maintenir nos données mondiales sur les centrales électriques exactes et à jour.