Kavsak Bendi Dam— 191,28 MW Hydroélectrique
Commissioned in 2007, Kavşak Bendi Dam is a pivotal player in Turkey's energy landscape, ranking as the 105th largest power generation facility with a capacity of 191.28 MW. This facility, which contributes 0.20% to Turkey's total energy capacity of 94,534 MW, is situated in a region abundant with hydroelectric resources, emphasizing the importance of renewable energy in the country’s power profile. Notably, the Kavşak Bendi Dam shares the spotlight with nearby hydro facilities, including the Yedigöze Sanibey Hidroelektrik Santrali and Yedigöze Dam, both boasting capacities of 310.66 MW and 310 MW, respectively. Together, these plants form a robust hydroelectric cluster that supports the local grid and contributes to energy reliability in the region. As the 30th largest hydro plant among 139 in Turkey, Kavşak Bendi Dam plays a crucial role in the country’s pursuit to diversify its energy portfolio, particularly in a national context where gas is the prevailing fuel type. The operational capacity of Kavşak Bendi Dam, while modest compared to its larger neighbors, is essential for maintaining a balanced energy mix in a grid increasingly reliant on renewable sources. Owned by Enerjİsa Enerjİ Üretİm Anonİm Şİrketİ, the dam not only contributes to energy generation but also highlights Turkey's commitment to sustainable practices. As the country continues to seek ways to enhance its renewable energy sources, Kavşak Bendi Dam stands as a testament to the potential of hydroelectric power in fostering economic growth and environmental sustainability, ensuring that Turkey remains on track to meet its energy needs in a responsible and forward-thinking manner.
19 ans d'ancienneté
Turquie, Asia
- 105e plus grande des 368 centrales de Turquie
- N° 7 638 mondial par puissance installée
- N° 1 511 sur 8 493 centrales Hydroélectrique dans le monde
- 0,2% de la puissance installée de Turquie
19 ans d'exploitation
Moyenne du parc Hydroélectrique : 42,1 ans
State Hydraulic Works (DSI) exploite 41 centrales totalisant 9 832 MW
28 centrales dans un rayon de 100 km, 8 222 MW au total
Source: Wikidata
Emplacement
Zéro émission directe
Kavsak Bendi Dam est une centrale hydro produisant environ 670 GWh d'électricité propre par an, sans émission directe de CO₂ pendant son exploitation.
Émissions sur le cycle de vie : ~24 g CO₂/kWh (fabrication, transport, démantèlement)
Détails Techniques
- Type de Combustible Principal
- Hydro
- Source d'Énergie
- Renouvelable
- Pays
Turquie- Continent
- Asia
- Source des Données
- Base de Données Mondiale des Centrales Électriques
Turquie — Profil Énergétique
Centrales Électriques à Proximité
Vous Voyez des Données Incorrectes ou Manquantes ?
Aidez-nous à améliorer notre base de données en signalant toute correction ou mise à jour. Votre contribution aide à maintenir nos données mondiales sur les centrales électriques exactes et à jour.