Alakopru Dam— 31,568 MW Hydroélectrique
Alaköprü Dam is a 31.568 MW hydro power plant in Turkey, commissioned in 2014. Ranked #98 of 139 hydro plants in Turkey. Its 31.568 MW represents 0.14% of Turkey's total hydro capacity of 22,862 MW. The largest hydro plant in Turkey is Atatürk Dam at 2,400 MW, making Alaköprü Dam 76 times smaller. Within 50 km, the nearest plants are Gezende HES (159.375 MW, Hydro), Gezende Dam (159 MW, Hydro), and Dayıcık (6.6 MW, Solar). The facility is located in Antalya Province, approximately 100 km from the city of Antalya.
12 ans d'ancienneté
Turquie, Asia
- 205e plus grande des 368 centrales de Turquie
- N° 16 284 mondial par puissance installée
- N° 3 781 sur 8 493 centrales Hydroélectrique dans le monde
- 0,03% de la puissance installée de Turquie
12 ans d'exploitation
Moyenne du parc Hydroélectrique : 42,1 ans
State Hydraulic Works (DSI) exploite 41 centrales totalisant 9 832 MW
10 centrales dans un rayon de 100 km, 5 169 MW au total
Source: Wikidata
Emplacement
Zéro émission directe
Alakopru Dam est une centrale hydro produisant environ 111 GWh d'électricité propre par an, sans émission directe de CO₂ pendant son exploitation.
Émissions sur le cycle de vie : ~24 g CO₂/kWh (fabrication, transport, démantèlement)
Détails Techniques
- Type de Combustible Principal
- Hydro
- Source d'Énergie
- Renouvelable
- Pays
Turquie- Continent
- Asia
- Source des Données
- Base de Données Mondiale des Centrales Électriques
Turquie — Profil Énergétique
Centrales Électriques à Proximité
Vous Voyez des Données Incorrectes ou Manquantes ?
Aidez-nous à améliorer notre base de données en signalant toute correction ou mise à jour. Votre contribution aide à maintenir nos données mondiales sur les centrales électriques exactes et à jour.