IRPC Industrial Zone Clean (Muang Cogeneration II) Power Plant— 240 MW Gaz Naturel
Ranked as the 82nd largest power generation facility in Thailand, the IRPC Industrial Zone Clean (Muang Cogeneration II) Power Plant plays a crucial role in the country’s energy landscape, particularly within the gas sector. With a capacity of 240 MW, this plant contributes a notable 0.24% to Thailand's total installed capacity of 99,456 MW, highlighting its significance in a nation where gas is the dominant fuel type. As the 58th largest gas plant out of 79 in Thailand, it underscores the competitive nature of the gas sector in the region. The IRPC facility employs advanced gas cogeneration technology, which allows for the simultaneous generation of electricity and useful heat from the same energy source. This highly efficient process not only maximizes energy output but also reduces greenhouse gas emissions compared to traditional power generation methods. The plant's strategic location enhances its operational efficiency, allowing it to serve the energy needs of nearby industrial zones effectively. In terms of regional energy context, the IRPC plant is surrounded by several significant power generation facilities, including the BLCP Power Plant and Gulf SRC Power Plant, both of which utilize gas and have substantial capacities of 1434 MW and 1325 MW, respectively. Additionally, the presence of coal-fired plants such as BLCP Power and โรงไฟฟ้า BLCP, both with capacities exceeding 1300 MW, demonstrates the diverse energy mix in the area. This concentration of power plants within a 50 km radius provides a robust energy network that supports the local grid, ensuring reliability and stability in electricity supply. On a national scale, Thailand's energy profile is characterized by its reliance on gas, which serves as the principal fuel for power generation, outpacing other sources. The IRPC Industrial Zone Clean Power Plant, while modest in size relative to the country's total capacity, plays a vital role in bolstering the gas supply within the energy mix. With a total of 293 plants across the nation, the average capacity per plant is approximately 339 MW, positioning the IRPC plant below this average yet still contributing to the overall energy infrastructure. Owned and operated by IRPC Public Company Limited, the plant's commissioning year is not specified, but its modern infrastructure signifies a commitment to cleaner energy solutions. Looking ahead, the IRPC Industrial Zone Clean Power Plant stands as a testament to Thailand's ongoing transition towards more efficient and environmentally friendly power generation methods, supporting both economic growth and sustainable development in the region.
11 ans d'ancienneté
Thaïlande, Asia
- 82e plus grande des 293 centrales de Thaïlande
- N° 6 803 mondial par puissance installée
- N° 2 491 sur 5 146 centrales Gaz Naturel dans le monde
- 0,25% de la puissance installée de Thaïlande
11 ans d'exploitation
Moyenne du parc Gaz Naturel : 26,9 ans
IRPC Public Company Limited exploite 1 centrales totalisant 240 MW
36 centrales dans un rayon de 100 km, 18 841 MW au total
Source: OpenStreetMap
Emplacement
Estimations basées sur le facteur d'émission du Gas (490 g CO₂/kWh) et le facteur de capacité (45 %). Les émissions réelles peuvent varier selon les conditions d'exploitation, le rendement et la qualité du combustible.
Détails Techniques
- Type de Combustible Principal
- Gas
- Source d'Énergie
- Non Renouvelable
- Pays
Thaïlande- Continent
- Asia
- Source des Données
- Base de Données Mondiale des Centrales Électriques
Thaïlande — Profil Énergétique
Centrales Électriques à Proximité