Elektrocieplownia Czechnica 2— 179 MW Gaz Naturel
Electrociepłownia Czechnica 2 stands out as Poland's 81st largest power generation facility among 318 plants, contributing a notable 0.22% to the nation’s electricity landscape. With a capacity of 179 MW, it ranks 14th among the 27 gas plants in the country, highlighting its importance within the regional energy matrix. Commissioned in 2025 by ZEW Kogeneracja, this facility represents a modern approach to power generation, utilizing natural gas to produce electricity and heat, thus aligning with Poland's ongoing transition from coal dependency. Technologically, Electrociepłownia Czechnica 2 employs combined heat and power (CHP) systems, enhancing efficiency by simultaneously generating electricity and useful thermal energy. This dual-purpose output is especially vital in urban areas, where demand for heating is significant, particularly during the colder months. The plant's strategic location near Wrocław allows it to effectively serve the local grid, offering reliable energy while complementing nearby facilities. Within a 50 km radius, several other power generation facilities operate, including the coal-fired EC Wrocław with a capacity of 263 MW, and the Wrocław combined heat and power plant, which has a capacity of 262.6 MW. These plants, primarily coal-dependent, contrast with Czechnica 2's cleaner gas technology, underlining the shift toward more sustainable energy sources in the region. Other nearby coal plants, such as Elektrociepłownia Wrocław (260 MW) and EC Czechnica (110 MW), further emphasize the local reliance on coal, which still dominates Poland’s energy profile. Poland's energy landscape is characterized by its total capacity of 82,656 MW, with coal as the dominant fuel. The introduction of Electrociepłownia Czechnica 2 marks a critical step in diversifying the fuel mix and reducing greenhouse gas emissions. As the country strives to meet European Union climate targets, facilities like Czechnica 2 will play a pivotal role in transitioning towards a more sustainable future. The ownership by ZEW Kogeneracja signifies a commitment to modernizing Poland's energy infrastructure. With its commissioning in 2025, this facility is positioned to significantly impact both local and national energy supply. As Poland continues to navigate its energy transition, Electrociepłownia Czechnica 2 stands as a beacon of progress, showcasing how gas plants can effectively bridge the gap between traditional coal reliance and a cleaner, more sustainable energy future.
1 ans d'ancienneté
Pologne, Europe
- 81e plus grande des 318 centrales de Pologne
- N° 7 857 mondial par puissance installée
- N° 2 743 sur 5 146 centrales Gaz Naturel dans le monde
- 0,22% de la puissance installée de Pologne
1 ans d'exploitation
Moyenne du parc Gaz Naturel : 26,9 ans
ZEW Kogeneracja exploite 2 centrales totalisant 289 MW
35 centrales dans un rayon de 100 km, 9 937 MW au total
Source: OpenStreetMap
Emplacement
Estimations basées sur le facteur d'émission du Gas (490 g CO₂/kWh) et le facteur de capacité (45 %). Les émissions réelles peuvent varier selon les conditions d'exploitation, le rendement et la qualité du combustible.
Détails Techniques
- Type de Combustible Principal
- Gas
- Source d'Énergie
- Non Renouvelable
- Pays
Pologne- Continent
- Europe
- Source des Données
- Base de Données Mondiale des Centrales Électriques
Pologne — Profil Énergétique
Centrales Électriques à Proximité
Vous Voyez des Données Incorrectes ou Manquantes ?
Aidez-nous à améliorer notre base de données en signalant toute correction ou mise à jour. Votre contribution aide à maintenir nos données mondiales sur les centrales électriques exactes et à jour.