Wlingi Dam— 53,62 MW Hydroélectrique
Wlingi Dam is a 53.62 MW hydro power plant in Indonesia, operated by PT PLN Nusantara Power since 1975. Ranked #30 of 66 hydro plants in Indonesia. Its 53.62 MW represents 0.68% of Indonesia's 7,874 MW total hydro capacity. The largest hydro plant in Indonesia is Upper Cisokan Pumped Storage Power Plant at 1,040 MW, making Wlingi Dam 19.4 times smaller. Nearby plants within 50 km include Sutami / Karangkates - Brantas (105 MW, Hydro), PLTA Sutami (103 MW, Hydro), and Karangkates Hydroelectric Power Plant (103 MW, Hydro). The facility is located in East Java, approximately 120 km southwest of Surabaya.
51 ans d'ancienneté
Indonésie, Asia
- 180e plus grande des 297 centrales de Indonésie
- N° 12 850 mondial par puissance installée
- N° 3 106 sur 8 493 centrales Hydroélectrique dans le monde
- 0,05% de la puissance installée de Indonésie
51 ans d'exploitation
Moyenne du parc Hydroélectrique : 42,1 ans
PT PLN Nusantara Power exploite 8 centrales totalisant 8 943 MW
20 centrales dans un rayon de 100 km, 2 453 MW au total
Source: Wikidata
Emplacement
Zéro émission directe
Wlingi Dam est une centrale hydro produisant environ 188 GWh d'électricité propre par an, sans émission directe de CO₂ pendant son exploitation.
Émissions sur le cycle de vie : ~24 g CO₂/kWh (fabrication, transport, démantèlement)
Détails Techniques
- Type de Combustible Principal
- Hydro
- Source d'Énergie
- Renouvelable
- Pays
Indonésie- Continent
- Asia
- Source des Données
- Base de Données Mondiale des Centrales Électriques
Indonésie — Profil Énergétique
Centrales Électriques à Proximité
Vous Voyez des Données Incorrectes ou Manquantes ?
Aidez-nous à améliorer notre base de données en signalant toute correction ou mise à jour. Votre contribution aide à maintenir nos données mondiales sur les centrales électriques exactes et à jour.