Yusufeli Dam— 540 MW Hydroelectric
The Yusufeli Dam, located in Turkey at coordinates 40.8161, 41.6447, represents a significant achievement in hydroelectric energy generation, boasting a capacity of 540 MW. Commissioned in 2022, this modern facility is pivotal for Turkey's energy strategy, which seeks to reduce reliance on imported fossil fuels and enhance domestic energy production. Utilizing advanced dam technology, the Yusufeli Dam captures and stores water from the surrounding rivers, generating electricity in a clean and sustainable manner. This hydro power plant is essential for bolstering the local energy grid, contributing to energy security, and providing reliable power to nearby communities. As Turkey continues to invest in renewable energy projects, the Yusufeli Dam plays a strategic role in the country's transition towards a more sustainable energy future. The significance of this facility extends beyond its generation capacity; it also plays a role in flood control, irrigation support, and ecological preservation, showcasing the multifaceted benefits of hydroelectric power in the region.
4 years old
Turkey, Asia
- 54. largest of 368 plants in Turkey
- #4,405 worldwide by installed capacity
- #681 of 8,493 Hydroelectric plants worldwide
- 0.57% of the installed capacity of Turkey
4 years in operation
Hydroelectric fleet average: 42.1 years
State Hydraulic Works (DSI) operates 41 plants totalling 9,832 MW
19 plants within 100 km, 2,469 MW combined
Source: Wikidata
Location
Zero Direct Emissions
Yusufeli Dam is a hydro power plant producing approximately 1892 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Turkey- Continent
- Asia
- Data Source
- Global Power Plant Database
Yusufeli Dam: A Key Player in Turkey's Hydroelectric Energy Landscape
The Yusufeli Dam, commissioned in 2022, stands as a significant hydroelectric power plant in Turkey with a capacity of 540 megawatts (MW). Situated in the Artvin Province, this dam harnesses the potential of the Çoruh River, which is known for its swift flow and substantial water resources. The construction of the Yusufeli Dam is part of Turkey's broader strategy to enhance its energy production through renewable resources, particularly hydroelectric power, which plays a critical role in the national energy sector.
Hydropower is a renewable energy source that generates electricity by utilizing the kinetic energy of flowing water. In the case of the Yusufeli Dam, water released from the reservoir flows through turbines, converting kinetic energy into mechanical energy, which is then transformed into electrical energy. This process not only provides a reliable source of electricity but also contributes to reducing greenhouse gas emissions compared to fossil fuel-based power generation. As a hydroelectric facility, Yusufeli Dam is expected to produce approximately 1.9 billion kilowatt-hours (kWh) of electricity annually, supplying power to thousands of households and businesses across the region.
The environmental impact of the Yusufeli Dam has been a topic of discussion among stakeholders. While hydroelectric power is generally considered cleaner than fossil fuels, large dam projects can disrupt local ecosystems, displace communities, and alter water flow patterns. The Yusufeli Dam's construction required careful planning and implementation of environmental management strategies to mitigate these impacts. Efforts were made to ensure that the ecological balance of the surrounding area is maintained as much as possible, aiming to minimize disruptions to fish populations and local wildlife habitats.
Regionally, the Yusufeli Dam is of great significance not only for its energy production but also for its potential to stimulate economic growth and development. By providing a reliable source of electricity, the dam supports local industries and agricultural practices, which are critical for the livelihoods of people in Artvin Province and beyond. Furthermore, the infrastructure associated with the dam, including roads and facilities, can enhance connectivity and access to resources in the area, ultimately contributing to regional development.
In conclusion, the Yusufeli Dam represents a crucial advancement in Turkey's commitment to renewable energy and sustainable development. With its substantial hydroelectric capacity, the dam plays an essential role in meeting the country's growing energy demands while promoting environmental stewardship. As Turkey continues to diversify its energy sources and reduce reliance on fossil fuels, the Yusufeli Dam is poised to be a key asset in the nation's energy portfolio.
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.