Laleli Dam— 99 MW Hydroelectric
Laleli Dam is a 99 MW hydro power plant in Turkey, with a capacity of 99 MW and commissioned in 2010. Ranked #57 of 139 hydro plants in Turkey. Its 99 MW represents 0.43% of Turkey's total hydro capacity of 22,862 MW. The largest hydro plant in Turkey is Atatürk Dam at 2,400 MW, making Laleli 24.2 times smaller. Nearby plants within 50 km include Güllübağ Barajı ve HES (96 MW, Hydro). The facility is located in Turkey, approximately 100 km east of Ankara.
11 years old
Turkey, Asia
- 142. largest of 368 plants in Turkey
- #10,394 worldwide by installed capacity
- #2,343 of 8,493 Hydroelectric plants worldwide
- 0.1% of the installed capacity of Turkey
11 years in operation
Hydroelectric fleet average: 42.1 years
State Hydraulic Works (DSI) operates 41 plants totalling 9,832 MW
13 plants within 100 km, 998 MW combined
Source: Wikidata
Location
Zero Direct Emissions
Laleli Dam is a hydro power plant producing approximately 347 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Turkey- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.