Bergama Integrated Solid Waste Management Facility— 9.898 MW Biomass
Bergama Integrated Solid Waste Management Facility is a 9.898 MW biomass plant in Turkey, commissioned in 2022. Ranked #4 of 5 biomass plants in Turkey. Its 9.898 MW accounts for 12.51% of Turkey's total biomass capacity of 79 MW. The largest biomass plant in Turkey is the Harmandalı Biogas Plant at 32 MW, making Bergama 3.2 times smaller. Nearby plants include Enka İzmir Doğalgaz Santrali (1,520 MW, Gas) and Soma B Termik Santrali (990 MW, Coal). The facility is located in İzmir Province, approximately 50 km from the city of İzmir.
4 years old
Turkey, Asia
- 268. largest of 368 plants in Turkey
- #24,797 worldwide by installed capacity
- #735 of 1,487 Biomass plants worldwide
- 0.01% of the installed capacity of Turkey
4 years in operation
Biomass fleet average: 20.5 years
19 plants within 100 km, 4,867 MW combined
Source: Wikidata
Location
Estimates based on Biomass emission factor (230 g CO₂/kWh) and capacity factor (65%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Biomass
- Energy Source
- Renewable
- Country
Turkey- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.