Testos is a 24 MW wind power plant in Portugal, commissioned in 2008. Ranked #50 of 222 wind plants in Portugal. Its 24 MW represents 0.49% of Portugal's 4,935 MW total wind capacity. The largest wind plant in Portugal is Alto Douro at 253 MW, making Testos 10.5 times smaller. Nearby plants within 50 km include Alto Douro (Wind, 253.2 MW), Arada-Montemuro (Wind, 121.2 MW), and Caramulo (Wind, 90 MW). The facility is located in Aveiro District, approximately 100 km south of Porto.
18 years old
Portugal, Europe
- 86. largest of 462 plants in Portugal
- #18,081 worldwide by installed capacity
- #2,968 of 5,731 Wind plants worldwide
- 0.16% of the installed capacity of Portugal
18 years in operation
Wind fleet average: 14.4 years
EDP Renewables operates 118 plants totalling 5,033 MW
205 plants within 100 km, 6,042 MW combined
Source: Energias Endogenas de Portugal
Location
Zero Direct Emissions
Testos is a wind power plant producing approximately 63 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Portugal- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.