Senhora do Castelo I is a 1.2 MW wind power plant in Portugal, operational since 2003. Ranked #215 of 222 wind plants in Portugal, it represents 0.02% of Portugal's total wind capacity of 4,935 MW. The largest wind plant in Portugal is Alto Douro at 253 MW, making Senhora do Castelo I 210 times smaller. Nearby plants include Tapada do Outeiro (990 MW, Gas), Arada-Montemuro (121.2 MW, Wind), and Caramulo (90 MW, Wind). The plant is located in the northern region of Portugal, approximately 50 km from Aveiro.
23 years old
Portugal, Europe
- 430. largest of 462 plants in Portugal
- #36,836 worldwide by installed capacity
- #5,469 of 5,731 Wind plants worldwide
- 0.01% of the installed capacity of Portugal
23 years in operation
Wind fleet average: 14.4 years
201 plants within 100 km, 6,020 MW combined
Source: Energias Endogenas de Portugal
Location
Zero Direct Emissions
Senhora do Castelo I is a wind power plant producing approximately 3 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Portugal- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.