Gevancas II11.5 MW Wind

WindRenewable

Gevancas II is an 11.5 MW wind power plant in Portugal, commissioned in 2013. It contributes to the country's renewable energy portfolio. Ranked #110 of 222 wind plants in Portugal, Gevancas II's 11.5 MW accounts for 0.23% of Portugal's total wind capacity of 4,935 MW. The largest wind plant in Portugal is Alto Douro at 253 MW, making Gevancas II 22 times smaller. Nearby plants within 50 km include Frades II (780 MW, Hydro), Alto Douro (253.2 MW, Wind), and Alto da Coutada (165.6 MW, Wind). The facility is located in the northern region of Portugal, approximately 100 km from Porto.

Capacity
11.5 MW
Commissioning Year
2013

13 years old

Owner
Location
41.3977°, -7.7934°

Portugal, Europe

Context & rankings
  • 162. largest of 462 plants in Portugal
  • #23,065 worldwide by installed capacity
  • #3,966 of 5,731 Wind plants worldwide
  • 0.08% of the installed capacity of Portugal
Age & fleet comparison

13 years in operation

Wind fleet average: 14.4 years

Regional density

196 plants within 100 km, 8,454 MW combined

Nearest plant: Alto do Marco (1.2 km)

Data provenance

Location

Coordinates:: 41.397700, -7.793400
Open in Google Maps
Carbon Footprint

Zero Direct Emissions

Gevancas II is a wind power plant producing approximately 30 GWh of clean electricity per year with zero direct CO₂ emissions during operation.

Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)

Technical Details

Primary Fuel Type
Wind
Energy Source
Renewable
Country
Portugal
Continent
Europe
Data Source
Global Power Plant Database

PortugalEnergy Profile

462
Total Plants
14.7 GW
Total Capacity
WindGasHydroCoal
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.