Cabril is a 20.2 MW wind power plant in Portugal, commissioned in 2002. Ranked #65 of 222 wind plants in Portugal. This facility's 20.2 MW represents 0.41% of Portugal's total wind capacity of 4,935 MW. The largest wind plant in Portugal is Alto Douro at 253 MW, making Cabril 12.5 times smaller. Nearby plants within 50 km include Tapada do Outeiro (990 MW, Gas), Arada-Montemuro (121.2 MW, Wind), and Caramulo (90 MW, Wind). The facility is located in the Aveiro region, approximately 90 km southwest of Porto.
24 years old
Portugal, Europe
- 105. largest of 462 plants in Portugal
- #18,977 worldwide by installed capacity
- #3,219 of 5,731 Wind plants worldwide
- 0.14% of the installed capacity of Portugal
24 years in operation
Wind fleet average: 14.4 years
205 plants within 100 km, 5,576 MW combined
Source: Energias Endogenas de Portugal
Location
Zero Direct Emissions
Cabril is a wind power plant producing approximately 53 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Wind
- Energy Source
- Renewable
- Country
Portugal- Continent
- Europe
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.