World Power Plants

Alto do Talefe13.5 MW Wind

WindRenewable

Alto do Talefe is a 13.5 MW wind power plant in Portugal, commissioned in 2004. Ranked #89 of 222 wind plants in Portugal, it accounts for 0.27% of the country's total wind capacity of 4,935 MW. The largest wind plant in Portugal is Alto Douro at 253 MW, making Alto do Talefe 18.7 times smaller. Nearby plants within 50 km include Alto Douro (Wind, 253.2 MW), Arada-Montemuro (Wind, 121.2 MW), and Caramulo (Wind, 90 MW). The facility is located in the Viseu District, approximately 80 km from the nearest major city, Viseu.

Capacity
13.5 MW
Commissioning Year
2004

22 years old

Owner
EDP Renewables
Location
40.9898°, -7.9868°

Portugal, Europe

Context & rankings
  • 132. largest of 462 plants in Portugal
  • #21,997 worldwide by installed capacity
  • #3,690 of 5,731 Wind plants worldwide
  • 0.09% of the installed capacity of Portugal
Age & fleet comparison

22 years in operation

Wind fleet average: 14.4 years

Operator portfolio

EDP Renewables operates 118 plants totalling 5,033 MW

Regional density

204 plants within 100 km, 6,705 MW combined

Nearest plant: Bustelo (1.7 km)

Data provenance

Location

Coordinates:: 40.989800, -7.986800
Open in Google Maps
Carbon Footprint

Zero Direct Emissions

Alto do Talefe is a wind power plant producing approximately 35 GWh of clean electricity per year with zero direct CO₂ emissions during operation.

Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)

Technical Details

Primary Fuel Type
Wind
Energy Source
Renewable
Country
Portugal
Continent
Europe
Data Source
Global Power Plant Database

PortugalEnergy Profile

462
Total Plants
14.7 GW
Total Capacity
WindGasHydroCoal
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.