As the 9th largest power generation facility in Peru, CaÑon del Pato stands out with its 247 megawatts of hydroelectric capacity. This facility, operated by Duke Energy Egenor S en C por A., represents a substantial 3.32% of Peru's total energy capacity of 7,432 MW. Thus, it plays a significant role in the national energy landscape, where hydroelectric generation is the dominant fuel type. Commissioned in 1958, CaÑon del Pato employs advanced hydroelectric technology to harness the power of flowing water. Its strategic location allows for efficient electricity generation while minimizing environmental impacts associated with fossil fuel combustion. The plant's capacity aligns well with Peru's commitment to renewable energy, particularly as the government seeks to further expand its renewable portfolio in the coming years. Within a 50 km radius of CaÑon del Pato, the nearby Quitaracsa plant, with a capacity of 115 MW, emphasizes the local reliance on hydroelectric generation. This proximity to another hydro facility highlights the development of a regional energy cluster that collectively enhances the stability and reliability of the grid. Unlike other regions in Peru, where diverse fuel types such as gas and coal are more prevalent, CaÑon del Pato exemplifies the country’s focus on leveraging its abundant water resources. Peru's energy profile is marked by a total of 32 generation plants, with hydroelectric power being the most significant contributor to the national capacity. The importance of CaÑon del Pato is magnified when considering its hydroelectric rank as the 3rd largest among 14 hydro plants. This strategic positioning ensures that the facility not only meets local demand but also contributes to the overall national energy strategy. Looking to the future, CaÑon del Pato is set to remain a cornerstone of Peru's energy infrastructure. As the country aims to diversify its energy sources while increasing reliance on renewables, this hydroelectric facility signifies a commitment to sustainable development and environmental stewardship. The operational longevity of CaÑon del Pato, alongside its significant capacity, will continue to provide critical support in meeting the growing energy needs of Peru.
68 years old
Peru, South America
- 9. largest of 32 plants in Peru
- #6,750 worldwide by installed capacity
- #1,258 of 8,493 Hydroelectric plants worldwide
- 3.32% of the installed capacity of Peru
68 years in operation
Hydroelectric fleet average: 42.1 years
Duke Energy Egenor S en C por A. operates 1 plants totalling 247 MW
1 plants within 100 km, 115 MW combined
Location
Zero Direct Emissions
CaÑon del Pato is a hydro power plant producing approximately 865 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Peru- Continent
- South America
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.