TADALI SPONGE IRON is a 33 MW coal-fired power plant in India, operated by Mukesh Gupta group. Commissioned in an unspecified year, it contributes 0.01% of India's total coal capacity of 328,151 MW. Ranked #311 of 340 coal plants in India, TADALI SPONGE IRON's 33 MW represents a small fraction of the country's coal capacity. The largest coal plant in India is VINDH_CHAL STPS at 4,760 MW, making this facility 144 times smaller. Nearby plants within 50 km include Chandrapur Super Thermal Power Station (2920 MW, Coal), CHANDRAPUR_Coal (2920 MW, Coal), and DHARIWAL INF TPP (600 MW, Coal). The facility is located in Maharashtra, approximately 150 km from Nagpur.
India, Asia
- 907. largest of 1,805 plants in India
- #16,060 worldwide by installed capacity
- #2,611 of 2,793 Coal plants worldwide
- 0.01% of the installed capacity of India
Mukesh Gupta group operates 1 plants totalling 33 MW
24 plants within 100 km, 9,422 MW combined
Source: Mukesh Gupta group
Location
Estimates based on Coal emission factor (820 g CO₂/kWh) and capacity factor (55%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Coal
- Energy Source
- Non-Renewable
- Country
India- Continent
- Asia
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.