World Power PlantsWorld Power Plants

Kuriemat 22,754 MW Gas

Gas

Kuriemat 2 is an essential facility in Egypt's energy generation portfolio, contributing an impressive 2754 MW of power to the national grid. This gas-fired power plant, also operated by the Upper Egypt Electricity Production Company, is strategically located at coordinates 29.2693° N and 31.2240° E in Upper Egypt. The plant's reliance on natural gas as its fuel source reflects Egypt’s commitment to utilizing cleaner energy alternatives, which is crucial in the context of global environmental standards and national energy policies aimed at reducing carbon emissions. Kuriemat 2 employs advanced gas turbine technology, allowing for efficient conversion of fuel into electricity while ensuring operational reliability. As Egypt continues to develop its energy infrastructure, Kuriemat 2 plays a significant role in meeting the increasing electricity demand from both residential and industrial sectors. The plant operates within a broader framework of initiatives focused on enhancing energy security and promoting sustainable practices in power generation, aligning with the nation's goal of diversifying its energy sources. The operational significance of Kuriemat 2 cannot be understated as it helps stabilize the energy supply, particularly during peak periods, thereby supporting economic growth and improving living standards in the region.

Capacity
2,754 MW

2.75 GW

Commissioning Year
2010

16 years old

Owner
Egyptian Electricity Holding Company
Location
29.2693°, 31.2240°

Egypt, Africa

Location
Coordinates:: 29.269300, 31.224000
Open in Google Maps
Technical Details
Primary Fuel Type
Gas
Energy Source
Non-Renewable
Country
Egypt
Continent
Africa
Data Source
Global Power Plant Database
Kuriemat 2 Power Plant: A Vital Component of Egypt's Energy Landscape

The Kuriemat 2 power plant, located in Egypt, is a significant contributor to the country’s energy infrastructure, boasting a substantial capacity of 2754 megawatts (MW). This gas-fired power plant plays a crucial role in enhancing Egypt's energy security and meeting the growing demand for electricity, particularly in light of the country's rapid population growth and industrial expansion. As part of a broader strategy to diversify energy sources and reduce reliance on less sustainable fuel types, Kuriemat 2 utilizes natural gas, which is known for its efficiency and lower emissions compared to other fossil fuels.

Natural gas, the primary fuel for Kuriemat 2, is a cleaner-burning alternative that emits significantly lower levels of greenhouse gases than coal or oil. This characteristic makes it an attractive option for countries like Egypt, which are striving to meet international climate goals while ensuring energy accessibility. The use of natural gas in power generation not only helps in reducing air pollution but also contributes to the overall efficiency of the energy conversion process. Kuriemat 2 employs advanced combined cycle technology, which allows for the simultaneous generation of electricity and useful thermal energy, thereby maximizing the utilization of the fuel and increasing the overall efficiency of the plant.

In terms of environmental impact, Kuriemat 2 represents a step towards more sustainable energy practices within Egypt. While it does produce carbon emissions, the shift from coal and oil to natural gas is expected to yield a substantial reduction in the carbon footprint associated with electricity generation. The plant is also designed to comply with environmental regulations and standards, which further mitigates its impact on the surrounding ecosystem. However, like all fossil fuel-based power plants, it faces scrutiny over potential risks related to gas extraction and the implications of continued fossil fuel dependence in the long term.

Regionally, Kuriemat 2 is significant not only for its role in Egypt's energy sector but also for its potential to influence energy dynamics in the broader Middle Eastern context. The plant supports Egypt's ambition to become a regional energy hub, particularly with the development of natural gas resources in the Eastern Mediterranean. By bolstering its electricity generation capacity with efficient gas-fired plants like Kuriemat 2, Egypt aims to enhance its energy exports and foster economic growth. This positions the country as a key player in the regional energy market, contributing to stability and cooperation among neighboring countries.

In conclusion, Kuriemat 2 serves as an essential asset in Egypt’s energy portfolio, reflecting the nation's commitment to energy diversification, environmental stewardship, and regional leadership in energy production. As the country continues to navigate the complexities of energy supply and demand, Kuriemat 2 will likely remain a focal point in shaping Egypt's energy future.

EgyptEnergy Profile
155
Total Plants
138.3 GW
Total Capacity
GasHydroNuclearSolar
Top Fuels
Gas Power Generation: An Overview of Its Mechanisms, Benefits, and Future Prospects

Gas power generation is a significant component of the global energy landscape, characterized by the use of natural gas to produce electricity. This process typically involves either gas turbines or combined cycle gas plants. In a gas turbine, compressed air is mixed with natural gas and ignited, producing high-temperature exhaust gases that spin a turbine connected to a generator. Combined cycle plants enhance efficiency by utilizing both gas and steam turbines. After the gas turbine generates electricity, the waste heat is used to produce steam, which drives a steam turbine, thereby maximizing energy extraction from the fuel.

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.