El Kuriemat Power Plant2,754 MW Natural Gas

GasVerified: Mar 2026

El Kuriemat Power Plant is a cornerstone of Egypt's energy generation sector, boasting a substantial capacity of 2754 MW. This gas-fired power facility, operated by the Upper Egypt Electricity Production Company, is integral to the national grid, providing a significant portion of the country’s electricity needs. Located near the coordinates 29.2749° N and 31.2226° E, El Kuriemat is situated in Upper Egypt, a region that serves as a critical area for energy production and distribution. The use of natural gas as the primary fuel type not only ensures a reliable energy supply but also aligns with Egypt's strategic objectives to transition towards cleaner energy sources. The plant employs advanced gas turbine technology, which enhances its operational efficiency and minimizes emissions, in line with national policies aimed at promoting sustainable energy practices. In the context of Egypt's broader energy landscape, El Kuriemat Power Plant plays a vital role in stabilizing the electricity supply, particularly as the country seeks to meet the growing demands of its population and industries. With ongoing investments in energy infrastructure and technological upgrades, the plant continues to be a significant player in supporting Egypt's energy security and economic growth.

Capacity
2,754 MW

2.75 GW

Commissioning Year
2010

16 years old

Owner
Upper Egypt Electricity Production Company
Location
29.2749°, 31.2226°

Egypt, Africa

Context & rankings
  • 8. largest of 155 plants in Egypt
  • #388 worldwide by installed capacity
  • #69 of 5,146 Natural Gas plants worldwide
  • 1.99% of the installed capacity of Egypt
Age & fleet comparison

16 years in operation

Natural Gas fleet average: 26.9 years

Operator portfolio

Upper Egypt Electricity Production Company operates 8 plants totalling 13,008 MW

Regional density

27 plants within 100 km, 44,255 MW combined

Nearest plant: Kuriemat 2 (0.6 km)

Data provenance

Source: Wikidata

Location

Coordinates:: 29.274879, 31.222630
Open in Google Maps
Carbon Footprint490 g CO₂/kWh
Annual CO₂
5.32 Mt
10856 GWh/year × 490 g/kWh
Cumulative CO₂
85.11 Mt
Over 16 years of operation
Est. Retirement
2040
14 years remaining
Annual emissions equivalent to
1.2M
cars per year
709.3K
homes per year
241.8M
trees to offset

Estimates based on Gas emission factor (490 g CO₂/kWh) and capacity factor (45%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.

Technical Details

Primary Fuel Type
Gas
Energy Source
Non-Renewable
Country
Egypt
Continent
Africa
Data Source
Global Power Plant Database

El Kuriemat Power Plant: A Cornerstone of Egypt's Energy Landscape

El Kuriemat Power Plant, located in Egypt, is a significant energy facility with a total capacity of 2,754 megawatts (MW). Owned by the Upper Egypt Electricity Production Company, this gas-fired power plant plays a crucial role in meeting the growing electricity demands of the country. As Egypt continues to develop its infrastructure and industry, the need for reliable and efficient power generation has become increasingly important, and El Kuriemat serves as a cornerstone of this effort.

The power plant utilizes natural gas as its primary fuel source, a decision that aligns with global trends towards cleaner energy production. Natural gas is known for its relatively low emissions compared to other fossil fuels, making it a more environmentally friendly option. The combustion of natural gas produces significantly lower levels of sulfur dioxide (SO2) and particulate matter, contributing to improved air quality. Furthermore, the transition from heavier fuels such as oil or coal to natural gas is a strategic move by Egypt to reduce greenhouse gas emissions and enhance sustainability in its energy sector.

From a technical perspective, the El Kuriemat Power Plant employs advanced gas turbine technology, which allows for high efficiency in power generation. The plant is equipped to utilize combined cycle systems, where waste heat from the gas turbines is captured and used to produce additional electricity through steam turbines. This process not only maximizes energy output but also minimizes fuel consumption, further enhancing the plant's overall efficiency and sustainability.

The environmental impact of El Kuriemat has been a focal point of its operation. While the plant contributes to the reduction of reliance on more polluting energy sources, it also necessitates ongoing efforts to manage water usage and waste. The facility incorporates measures to mitigate impacts on local ecosystems, and continuous monitoring is essential to ensure compliance with environmental regulations. Additionally, the plant plays a role in the broader context of Egypt's commitment to international climate agreements, as it seeks to transition towards more sustainable energy practices.

Regionally, the El Kuriemat Power Plant is significant not only for its contribution to Egypt's energy supply but also for its role in supporting economic growth and development. It helps to stabilize the national grid, providing reliable electricity to households and industries alike. This reliability is crucial for attracting foreign investment and fostering local economic activities. As Egypt strives to position itself as a leader in energy production in the Middle East and North Africa, facilities like El Kuriemat are vital in supporting this ambition and ensuring a more secure energy future for the nation.

EgyptEnergy Profile

155
Total Plants
138.3 GW
Total Capacity
GasHydroNuclearSolar
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.