World Power Plants

Xinjiang Dabancheng Phase 149 MW Wind

WindRenewable

Xinjiang Dabancheng Phase 1 is a 49 MW wind power plant in China, operated since its commissioning year is not specified. Ranked #90 of 833 wind plants in China, this facility represents 0.1% of China's total wind capacity of 50,905 MW. The largest wind plant in China is Gansu Wind Farm at 6,000 MW, making Xinjiang Dabancheng Phase 1 122 times smaller. Nearby plants include Hongyanchi-2 power station (800 MW, Coal), 华电新疆红雁池发电有限公司 (660 MW, Coal), and Hua Dian Xin Jiang Hong Yan Chi Fa Dian You Xian Gong Si (660 MW, Coal). The facility is located in Xinjiang Province, approximately 500 km from Urumqi.

Capacity
49 MW
Commissioning Year
2016

10 years old

Owner
China Three Gorges Corporation
Location
43.5501°, 88.0693°

China, Asia

Context & rankings
  • 1,942. largest of 4,431 plants in China
  • #13,724 worldwide by installed capacity
  • #1,415 of 5,731 Wind plants worldwide
Age & fleet comparison

10 years in operation

Wind fleet average: 14.4 years

Operator portfolio

China Three Gorges Corporation operates 508 plants totalling 127,392 MW

Regional density
Data provenance

Location

Coordinates:: 43.550100, 88.069300
Open in Google Maps
Carbon Footprint

Zero Direct Emissions

Xinjiang Dabancheng Phase 1 is a wind power plant producing approximately 129 GWh of clean electricity per year with zero direct CO₂ emissions during operation.

Lifecycle emissions: ~11 g CO₂/kWh (manufacturing, transport, decommissioning)

Technical Details

Primary Fuel Type
Wind
Energy Source
Renewable
Country
China
Continent
Asia
Data Source
Global Power Plant Database

ChinaEnergy Profile

4,431
Total Plants
1617.1 GW
Total Capacity
CoalHydroNuclearGas
Top Fuels

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.