RSP-2 is a 6.5 MW hydroelectric power plant in Canada, operated by Fiducie Boralex Énergie/Boralex Inc. Ranked #416 of 612 hydro plants in Canada, RSP-2's 6.5 MW accounts for 0.01% of Canada's total hydro capacity of 102,715 MW. The largest hydro plant in Canada is Centrale Robert-Bourassa at 5,616 MW, making RSP-2 865.1 times smaller. Nearby plants within 50 km include Bersimis-2 (869 MW, Hydro), Portneuf-2 (11.7 MW, Hydro), and Portneuf-3 (8.7 MW, Hydro). The facility is located in Quebec, approximately 250 km northeast of Quebec City.
Canada, North America
- 936. largest of 1,334 plants in Canada
- #27,004 worldwide by installed capacity
- #6,124 of 8,493 Hydroelectric plants worldwide
Fiducie Boralex Énergie/Boralex Inc operates 4 plants totalling 27 MW
19 plants within 100 km, 5,637 MW combined
Source: Natural Resources Canada
Location
Zero Direct Emissions
RSP-2 is a hydro power plant producing approximately 23 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Canada- Continent
- North America
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.