The Rapide-Blanc power generation facility stands as a notable contributor to Canada's hydroelectric landscape, ranking #165 among 1,334 plants nationwide. This positioning reflects its significance within a country where hydroelectric energy is the dominant fuel source, comprising a substantial share of the national capacity. With a generation capacity of 204 MW, Rapide-Blanc represents approximately 0.11% of Canada’s total installed capacity of 193,190 MW, underscoring its role in supporting the Canadian grid. The facility utilizes advanced hydroelectric technology, harnessing the power of water flow to generate electricity efficiently and sustainably. Situated in the scenic region of Quebec, Rapide-Blanc is part of a cluster of hydro plants that includes the larger Trenche plant, which boasts a capacity of 302 MW, and La Tuque, with 294 MW. Nearby, the Centrale Beaumont and Centrale du Rapide-Blanc each have a capacity of 270 MW, highlighting a competitive hydroelectric environment where multiple facilities work in tandem to provide reliable power. This regional concentration of hydro plants not only enhances the stability of the local electricity supply but also promotes the integration of renewable energy resources into Canada’s broader energy portfolio. In the context of Canada's energy profile, where hydroelectric power leads the way, the Rapide-Blanc facility plays a vital role in maintaining the balance of supply and demand. While the country has a diverse mix of electricity generation sources, hydropower remains a cornerstone, emphasizing the importance of facilities like Rapide-Blanc in achieving energy security and sustainability goals. Hydro-Québec, the operator of Rapide-Blanc, is well-regarded for its commitment to renewable energy and environmental stewardship, having commissioned the facility to harness the natural resources of the area effectively. The plant has been operational since its commissioning, contributing to the grid's reliability and the province's energy independence. Looking ahead, the Rapide-Blanc power generation facility is poised to continue its role as an essential player in Quebec’s energy landscape. As Canada seeks to transition to a low-carbon economy, the significance of hydroelectric plants like Rapide-Blanc will only grow, reinforcing the nation’s commitment to clean energy and sustainable development.
26 years old
Canada, North America
- 165. largest of 1,334 plants in Canada
- #7,324 worldwide by installed capacity
- #1,452 of 8,493 Hydroelectric plants worldwide
- 0.11% of the installed capacity of Canada
26 years in operation
Hydroelectric fleet average: 42.1 years
Hydro-Québec operates 174 plants totalling 59,537 MW
8 plants within 100 km, 1,494 MW combined
Source: Natural Resources Canada
Location
Zero Direct Emissions
Rapide-Blanc is a hydro power plant producing approximately 715 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Canada- Continent
- North America
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.