Healey Falls Hydroelectric— 18 MW Hydroelectric
Healey Falls Hydroelectric is an 18 MW hydroelectric power plant in Canada, operated by Ontario Power Generation. Ranked #277 of 612 hydro plants in Canada. Its 18 MW represents 0.02% of Canada's total hydro capacity of 102,715 MW. The largest hydro plant in Canada is Centrale Robert-Bourassa at 5,616 MW, making Healey Falls 312.9 times smaller. Nearby plants within 50 km include Healey Falls (18 MW, Hydro), Penn Energy - Hamilton Port Hope-4 (10 MW, Solar), and Northland Power Solar Belleville North (10 MW, Solar). The facility is located in Ontario, approximately 150 km east of Toronto.
26 years old
Canada, North America
- 618. largest of 1,334 plants in Canada
- #20,289 worldwide by installed capacity
- #4,616 of 8,493 Hydroelectric plants worldwide
- 0.01% of the installed capacity of Canada
26 years in operation
Hydroelectric fleet average: 42.1 years
Ontario Power Generation operates 45 plants totalling 24,463 MW
65 plants within 100 km, 12,097 MW combined
Source: OpenStreetMap
Location
Zero Direct Emissions
Healey Falls Hydroelectric is a hydro power plant producing approximately 63 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Canada- Continent
- North America
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.