E B Campbell is a significant hydroelectric power plant located in Canada, boasting a capacity of 289 MW. This facility, owned and operated by Saskatchewan Power Corp, plays a crucial role in the energy generation landscape of Saskatchewan. The plant harnesses the power of flowing water, utilizing hydro technology to produce clean, renewable energy that contributes to the province's energy mix. Situated at coordinates 53.6890, -103.3475, E B Campbell is strategically positioned to take advantage of the region's abundant water resources, making it an essential asset for local electricity generation. As Canada aims to reduce its carbon footprint and transition towards greener energy sources, E B Campbell stands out as a reliable source of hydroelectric power, providing a sustainable alternative to fossil fuels. The operational context of this plant is aligned with Canada's national energy policy, which emphasizes the importance of renewable energy in achieving climate goals. E B Campbell not only supports the local grid by ensuring a stable supply of electricity but also plays a vital role in enhancing energy security for the region. The facility's contribution to the energy landscape is further underscored by its ability to generate electricity with minimal environmental impact, positioning it as a key component in Saskatchewan's journey towards a more sustainable energy future. With its long-standing operational history and commitment to clean energy, E B Campbell exemplifies the potential of hydro power in meeting the energy demands of a modern society while preserving the natural environment.
30 years old
Canada, North America
- 126. largest of 1,334 plants in Canada
- #6,257 worldwide by installed capacity
- #1,148 of 8,493 Hydroelectric plants worldwide
- 0.15% of the installed capacity of Canada
30 years in operation
Hydroelectric fleet average: 42.1 years
Saskatchewan Power Corp operates 15 plants totalling 3,586 MW
1 plants within 100 km, 255 MW combined
Source: Natural Resources Canada
Location
Zero Direct Emissions
E B Campbell is a hydro power plant producing approximately 1013 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
Canada- Continent
- North America
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.