Jari Celulose is a 55 MW biomass power plant in Brazil, commissioned in 1976. It is operated by an undisclosed operator. This facility contributes 0.43% of Brazil's total biomass capacity of 12,644 MW across 425 plants. Ranked #72 of 425 biomass plants in Brazil, Jari Celulose's 55 MW represents a small fraction of the country's biomass capacity. The largest biomass plant in Brazil is Klabin Celulose at 330 MW, making Jari Celulose 6 times smaller. Nearby plants include Santo Antônio do Jari (373.4 MW, Hydro), Laranjal do Jari (8.675 MW, Oil), and Monte Dourado (4.2 MW, Oil). The plant is located in the Amapá region, approximately 200 km from the nearest major city, Macapá.
50 years old
Brazil, South America
- 378. largest of 2,402 plants in Brazil
- #12,712 worldwide by installed capacity
- #194 of 1,487 Biomass plants worldwide
- 0.02% of the installed capacity of Brazil
50 years in operation
Biomass fleet average: 20.5 years
Jari Celulose S.A. operates 2 plants totalling 428 MW
3 plants within 100 km, 386 MW combined
Location
Estimates based on Biomass emission factor (230 g CO₂/kWh) and capacity factor (65%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Biomass
- Energy Source
- Renewable
- Country
Brazil- Continent
- South America
- Data Source
- Global Power Plant Database
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.