Phase 4 - Parabolic Trough 2— 200 MW Solar
Ranked as the 50th largest power generation facility in the United Arab Emirates, the Phase 4 - Parabolic Trough 2 stands out as a significant contributor to the nation's solar energy landscape, boasting a capacity of 200 MW. This facility is particularly notable as the 7th largest solar plant among 22 solar installations in the country, representing a modest but meaningful 0.21% of the UAE's total capacity of 97,291 MW. The UAE's energy profile is predominantly gas-based, with natural gas dominating its energy mix, which highlights the importance of diversifying into renewable sources like solar. The Parabolic Trough 2 utilizes advanced solar thermal technology, specifically parabolic trough collectors that concentrate sunlight to produce steam, which then drives a turbine to generate electricity. This method not only enhances efficiency but also aligns with global trends toward sustainable energy practices. Located within a vibrant energy cluster, the plant is surrounded by several significant gas-powered facilities, including the Jebel Ali Power Station, which has a capacity of 9,547 MW, and the Jebel Ali Power and Desalination Plant, with 8,694.1 MW. These nearby plants underscore the regional reliance on fossil fuels, making Phase 4 - Parabolic Trough 2 a critical player in the transition to a more sustainable energy future. Its proximity to the Mohammed bin Rashid Al Maktoum Solar Park, the largest solar facility in the region with a capacity of 2,427 MW, further emphasizes this plant's role in the UAE's ambitious renewable energy goals. Operated by a consortium focused on advancing solar technology, this facility was commissioned to bolster the UAE's energy diversification strategy. Looking ahead, the Phase 4 - Parabolic Trough 2 is poised to play an essential role in the UAE's efforts to reduce carbon emissions and enhance energy security, contributing to the broader global shift towards clean energy solutions.
13 Jahre alt
Vereinigte Arabische Emirate, Asia
- 50. größtes von 81 Kraftwerken in Vereinigte Arabische Emirate
- Nr. 7.393 weltweit nach installierter Leistung
- Nr. 123 von 11.042 Solar-Kraftwerken weltweit
- 0,21% der installierten Leistung von Vereinigte Arabische Emirate
13 Jahre in Betrieb
Durchschnitt der Solar-Flotte: 10,4 Jahre
Abu Dhabi Water and Electricity Authority betreibt 9 Kraftwerke mit insgesamt 8.266 MW
49 Kraftwerke im Umkreis von 100 km, zusammen 57.246 MW
Nächstes Kraftwerk: مجمع محمد بن راشد آل مكتوم للطاقة الشمسية (2,2 km)
Quelle: OpenStreetMap
Standort
Keine direkten Emissionen
Phase 4 - Parabolic Trough 2 ist ein solar-Kraftwerk und erzeugt jährlich etwa 315 GWh sauberen Strom ohne direkte CO₂-Emissionen im Betrieb.
Lebenszyklusemissionen: ~41 g CO₂/kWh (Herstellung, Transport, Rückbau)
Technische Details
- Primärer Brennstofftyp
- Solar
- Energiequelle
- Erneuerbar
- Land
Vereinigte Arabische Emirate- Kontinent
- Asia
- Datenquelle
- Globale Datenbank der Kraftwerke
Vereinigte Arabische Emirate — Energieprofil
Nahegelegene Kraftwerke
Falsche oder fehlende Daten gefunden?
Helfen Sie uns, unsere Datenbank zu verbessern, indem Sie Korrekturen oder Aktualisierungen melden. Ihr Beitrag hilft, unsere globalen Kraftwerksdaten aktuell und genau zu halten.