Phase 1— 13 MW Solar
Phase 1 is a 13 MW solar power plant in the United Arab Emirates, operated by Dubai Electricity & Water Authority (DEWA) since its commissioning. Ranked #13 of 22 solar plants in the United Arab Emirates, this facility contributes 0.17% of the country's total solar capacity of 7,825 MW. The largest solar plant in the United Arab Emirates is مجمع محمد بن راشد آل مكتوم للطاقة الشمسية at 2,427 MW, making Phase 1 186 times smaller. Nearby plants include محطة كهرباء جبل علي (Gas, 9,547 MW), Jebel Ali Power and Desalination Plant (Gas, 8,694.1 MW), and Emirates Global Aluminium Jebel Ali power plant (Gas, 2,950 MW). The facility is located in Dubai, approximately 35 km southwest of the city center.
5 Jahre alt
Vereinigte Arabische Emirate, Asia
- 62. größtes von 81 Kraftwerken in Vereinigte Arabische Emirate
- Nr. 22.124 weltweit nach installierter Leistung
- Nr. 3.258 von 11.039 Solar-Kraftwerken weltweit
- 0,01% der installierten Leistung von Vereinigte Arabische Emirate
5 Jahre in Betrieb
Durchschnitt der Solar-Flotte: 10,4 Jahre
Dubai Electricity & Water Authority (DEWA) betreibt 1 Kraftwerke mit insgesamt 13 MW
51 Kraftwerke im Umkreis von 100 km, zusammen 64.147 MW
Quelle: OpenStreetMap
Standort
Keine direkten Emissionen
Phase 1 ist ein solar-Kraftwerk und erzeugt jährlich etwa 20 GWh sauberen Strom ohne direkte CO₂-Emissionen im Betrieb.
Lebenszyklusemissionen: ~41 g CO₂/kWh (Herstellung, Transport, Rückbau)
Technische Details
- Primärer Brennstofftyp
- Solar
- Energiequelle
- Erneuerbar
- Land
Vereinigte Arabische Emirate- Kontinent
- Asia
- Datenquelle
- Globale Datenbank der Kraftwerke
Vereinigte Arabische Emirate — Energieprofil