Zonnepark Transberg— 7,5 MW Solar
Zonnepark Transberg is a 7.5 MW solar power plant in the Netherlands, operated by Drechtsteden Energie and commissioned in 2018. It is part of the Netherlands' renewable energy efforts. Ranked #38 of 65 solar plants in the Netherlands, Zonnepark Transberg's 7.5 MW represents 0.68% of the total solar capacity of 1,102 MW. The largest solar plant in the Netherlands is Zonnepark Kerkrade at 148 MW, making this facility 19.7 times smaller. Nearby plants within 50 km include DOEL 4 (2,910 MW, Nuclear), Amercentrale (1,245 MW, Biomass), and Rijnmond Energie (820 MW, Gas). The facility is located in the South Holland province, approximately 30 km from Rotterdam.
8 Jahre alt
Niederlande, Europe
- 152. größtes von 253 Kraftwerken in Niederlande
- Nr. 26.297 weltweit nach installierter Leistung
- Nr. 4.905 von 11.039 Solar-Kraftwerken weltweit
- 0,02% der installierten Leistung von Niederlande
8 Jahre in Betrieb
Durchschnitt der Solar-Flotte: 10,4 Jahre
Drechtsteden Energie betreibt 1 Kraftwerke mit insgesamt 8 MW
156 Kraftwerke im Umkreis von 100 km, zusammen 25.153 MW
Quelle: OpenStreetMap
Standort
Keine direkten Emissionen
Zonnepark Transberg ist ein solar-Kraftwerk und erzeugt jährlich etwa 12 GWh sauberen Strom ohne direkte CO₂-Emissionen im Betrieb.
Lebenszyklusemissionen: ~41 g CO₂/kWh (Herstellung, Transport, Rückbau)
Technische Details
- Primärer Brennstofftyp
- Solar
- Energiequelle
- Erneuerbar
- Land
Niederlande- Kontinent
- Europe
- Datenquelle
- Globale Datenbank der Kraftwerke
Nahegelegene Kraftwerke
Falsche oder fehlende Daten gefunden?
Helfen Sie uns, unsere Datenbank zu verbessern, indem Sie Korrekturen oder Aktualisierungen melden. Ihr Beitrag hilft, unsere globalen Kraftwerksdaten aktuell und genau zu halten.