GAEC Breton— 0,25 MW Biomasse
GAEC Breton is a 0.25 MW biomass power plant in France, commissioned in 2015. It operates within the biomass sector, which totals 1,053 MW across 163 plants, contributing 0.02% of the national biomass capacity. Ranked #137 of 163 biomass plants in France, it is much smaller than the largest biomass plant, Port-Est bioenergy power plant, which has a capacity of 210 MW, making GAEC Breton 840 times smaller. Nearby facilities include Rully (12 MW, Wind), La Haie-Traversaine (12 MW, Wind), and Aubigny (10.5 MW, Wind). The plant is located in the Normandy region, approximately 50 km from the city of Caen.
11 Jahre alt
Frankreich, Europe
- 2.141. größtes von 2.195 Kraftwerken in Frankreich
- Nr. 38.559 weltweit nach installierter Leistung
- Nr. 1.445 von 1.487 Biomasse-Kraftwerken weltweit
11 Jahre in Betrieb
Durchschnitt der Biomasse-Flotte: 20,5 Jahre
80 Kraftwerke im Umkreis von 100 km, zusammen 387 MW
Nächstes Kraftwerk: O' Verger d'Andaine (moulin Guérin) (10,8 km)
Quelle: OpenStreetMap
Standort
Schätzungen basieren auf dem Emissionsfaktor für Biomass (230 g CO₂/kWh) und dem Kapazitätsfaktor (65%). Die tatsächlichen Emissionen können je nach Betriebsbedingungen, Effizienz und Brennstoffqualität variieren.
Technische Details
- Primärer Brennstofftyp
- Biomass
- Energiequelle
- Erneuerbar
- Land
Frankreich- Kontinent
- Europe
- Datenquelle
- Globale Datenbank der Kraftwerke
Frankreich — Energieprofil
Nahegelegene Kraftwerke
Falsche oder fehlende Daten gefunden?
Helfen Sie uns, unsere Datenbank zu verbessern, indem Sie Korrekturen oder Aktualisierungen melden. Ihr Beitrag hilft, unsere globalen Kraftwerksdaten aktuell und genau zu halten.