GES-1 of the Cascade of the Kuban HPPs是一座位于俄罗斯的水电厂。它的装机容量为37 MW,来自水能。由PJSC "RusHydro"运营。
装机容量
37 兆瓦
投产年份
—
所有者
PJSC "RusHydro"
位置
44.2764°, 42.4722°
俄罗斯, Europe
位置
坐标:: 44.276400, 42.472200
在Google地图中打开Carbon Footprint
Zero Direct Emissions
GES-1 of the Cascade of the Kuban HPPs is a hydro power plant producing approximately 130 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
技术详情
- 主要燃料类型
- Hydro
- 能源来源
- 可再生
- 国家
俄罗斯- 大洲
- Europe
- 数据来源
- 全球电厂数据库
附近的发电厂
Stavropolskaya GRES
Gas2,415 MW
Nevinnomysskaya GRES
Gas1,530.2 MW
Nevinnomysskya
Gas1,530.2 MW
Zelenchukskaya HPP-PSPP
Hydro320 MW
库班水电站级联HPP-2
Hydro184 MW
GES-3 of the Cascade of Kuban HPPs
Hydro87 MW
HPP-4 of the Cascade of Kuban HPPs
Hydro78 MW
Kashhatau HPP of the Cascade of Nizhne-Cherekskiye HPPs
Hydro65.1 MW