World Power PlantsWorld Power Plants

Phase 4 - Parabolic Trough 2200 MW Solar

SolarFornybar

Phase 4 - Parabolic Trough 2 är ett 200 MW solar kraftverk beläget i Forenade Arabemiraten. Taget i drift 2013. Ägs av Abu Dhabi Water and Electricity Authority.

Kapacitet
200 MW
Idrifttagningsar
2013

13 ar gammalt

Agare
Abu Dhabi Water and Electricity Authority
Plats
24.7370°, 55.4622°

Forenade Arabemiraten, Asia

Plats

Koordinater:: 24.736951, 55.462234
Oppna i Google Maps
Carbon Footprint

Zero Direct Emissions

Phase 4 - Parabolic Trough 2 is a solar power plant producing approximately 315 GWh of clean electricity per year with zero direct CO₂ emissions during operation.

Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)

Tekniska detaljer

Primar bransletyp
Solar
Energikalla
Fornybar
Land
Forenade Arabemiraten
Kontinent
Asia
Datakalla
Global Power Plant Database

Forenade ArabemiratenEnergiprofil

81
Totalt antal kraftverk
93.9 GW
Total kapacitet
GasNuclearSolar
Toppbränslen

Solenergi: En viktig kraftkälla inom energisektorn

Solenergi har blivit en alltmer betydelsefull kraftkälla inom den globala energisektorn. Denna form av energi utnyttjar solens strålar för att generera elektricitet, vilket gör den till en ren och förnybar resurs. Solenergi kan omvandlas till elektricitet genom två huvudsakliga teknologier: solpaneler och solvärme. Solpaneler, som oftast är tillverkade av kisel, omvandlar solens ljus direkt till elektricitet genom den fotovoltaiska effekten. Solvärmesystem, å sin sida, använder solens värme för att producera ånga som driver turbiner, vilket genererar elektricitet.

Ser du felaktig eller saknad data?

Hjalp oss forbattra var databas genom att rapportera korrigeringar eller uppdateringar. Ditt bidrag hjalper till att halla var globala kraftverksdata korrekt och uppdaterad.