PLTU Pangkalan Susu 1 & 2400 MW Coal

Coal

PLTU Pangkalan Susu 1 & 2 är ett kolkraftverk beläget i Indonesien. Det har en installerad kapacitet på 400 MW som genereras från kolenergi. Det drivs av PLN (EPC: PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi).

Kapacitet
400 MW
Idrifttagningsar
2014

12 ar gammalt

Agare
PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi)
Plats
4.1196°, 98.2555°

Indonesien, Asia

Plats

Koordinater:: 4.119600, 98.255500
Oppna i Google Maps
Carbon Footprint820 g CO₂/kWh
Annual CO₂
1.58 Mt
1927 GWh/year × 820 g/kWh
Cumulative CO₂
18.96 Mt
Over 12 years of operation
Est. Retirement
2054
28 years remaining
Annual emissions equivalent to
343.5K
cars per year
210.7K
homes per year
71.8M
trees to offset

Estimates based on Coal emission factor (820 g CO₂/kWh) and capacity factor (55%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.

Tekniska detaljer

Primar bransletyp
Coal
Energikalla
Icke-fornybar
Land
Indonesien
Kontinent
Asia
Datakalla
Global Power Plant Database

IndonesienEnergiprofil

297
Totalt antal kraftverk
108.2 GW
Total kapacitet
GasCoalHydroGeothermal
Toppbränslen

Kolk som energikälla: Kraftgenerering och energisektorn

Kolk har länge varit en av de mest använda energikällorna i världen, särskilt för kraftgenerering. Denna fossila bränsle, som bildas av döda växter under miljontals år, utgör en viktig del av den globala energimixen och har varit en grundpelare för industriell utveckling. Under det senaste århundradet har kol varit en dominerande energikälla, men det har också mött kritik på grund av sina negativa miljöeffekter.