Tenaga Nasional Berhad – Kraftverk
27 anläggningar • 19,765 MW total installerad kapacitet • 160 länder
| # | Kraftverk | Land | Kapacitet (MW) | År |
|---|---|---|---|---|
| 1 | Kapar Energy Ventures (KEV) | Malaysia | 2,420 | 1998 |
| 2 | Sultan Salahuddin Abdul Aziz Power Station | Malaysia | 2,200 | 1985 |
| 3 | Tg. Bin Energy | Malaysia | 2,100 | 2016 |
| 4 | Stesen Janaelektrik Tuanku Jaafar | Malaysia | 1,411 | 1999 |
| 5 | Segari | Malaysia | 1,303 | 2014 |
| 6 | Paka | Malaysia | 1,136 | 2014 |
| 7 | TNB Prai | Malaysia | 1,071 | 1997 |
| 8 | Connought Bridge | Malaysia | 828 | 2010 |
| 9 | Tuanku Jaafar (PDI) | Malaysia | 714 | 1999 |
| 10 | Tyanku Jaafar (PDII) | Malaysia | 708 | 2000 |
| 11 | Kuala Langat Power Plant | Malaysia | 675 | 2015 |
| 12 | Teknologi Tenaga Perlis Consortium | Malaysia | 650 | 1998 |
| 13 | Perlis Power Station | Malaysia | 650 | 1997 |
| 14 | Putrajaya | Malaysia | 625 | 2014 |
| 15 | Pergau | Malaysia | 600 | 1994 |
| 16 | Kenyir | Malaysia | 400 | 1991 |
| 17 | Stesen Janaelektrik Sultan Mahmud | Malaysia | 400 | 1996 |
| 18 | Prai Power | Malaysia | 350 | 1998 |
| 19 | Gelugor | Malaysia | 330 | 2014 |
| 20 | Pahlawan Power | Malaysia | 322 | 2014 |
| 21 | Kimanis Power Plant | Malaysia | 285 | 2016 |
| 22 | Stesen Janaelektrik Hulu Terengganu | Malaysia | 265 | 2010 |
| 23 | Hulu Terengganu | Malaysia | 250 | 2018 |
| 24 | Stesen Janakuasa Chenderoh | Malaysia | 40.5 | — |
| 25 | District Cooling Centre 2 | Malaysia | 26 | 2015 |
| 26 | Sepang 5 | Malaysia | 5 | 2018 |
| 27 | Stesen Sistem Solar Hibrid | Malaysia | 0 | 2020 |