PLTU Pangkalan Susu 1 & 2400 MW Coal

Coal

PLTU Pangkalan Susu 1 & 2 este o centrală electrică pe cărbune situată în Indonezia. Are o capacitate instalată de 400 MW generată din energie pe cărbune. Este operată de PLN (EPC: PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi).

Capacitate
400 MW
Anul Punerii in Functiune
2014

12 ani vechime

Proprietar
PLN (EPC : PT. Bagus Karya Guangdong Power Engineering PT. Nincec Multi Dimensi)
Locatie
4.1196°, 98.2555°

Indonezia, Asia

Locatie

Coordonate:: 4.119600, 98.255500
Deschide in Google Maps
Carbon Footprint820 g CO₂/kWh
Annual CO₂
1.58 Mt
1927 GWh/year × 820 g/kWh
Cumulative CO₂
18.96 Mt
Over 12 years of operation
Est. Retirement
2054
28 years remaining
Annual emissions equivalent to
343.5K
cars per year
210.7K
homes per year
71.8M
trees to offset

Estimates based on Coal emission factor (820 g CO₂/kWh) and capacity factor (55%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.

Detalii Tehnice

Tip Combustibil Principal
Coal
Sursa de Energie
Neregenerabila
Tara
Indonezia
Continent
Asia
Sursa Datelor
Baza de Date Globala a Centralelor Electrice

IndoneziaProfil Energetic

297
Total Centrale
108.2 GW
Capacitate Totala
GasCoalHydroGeothermal
Cele Mai Bune Combustibile

Utilizarea cărbunelui ca sursă de energie în sectorul energetic

Cărbunele este una dintre cele mai vechi și utilizate surse de energie, având un rol semnificativ în generarea de electricitate la nivel mondial. Deși utilizarea sa a fost contestată din cauza impactului asupra mediului, cărbunele rămâne o resursă esențială în sectorul energetic, în special în regiunile unde alte surse de energie sunt limitate sau mai costisitoare.