PLTGU Muara Tawar Block 1 &2920 MW Gas

Gas

PLTGU Muara Tawar Block 1 &2 este o centrală electrică pe gaz situată în Indonezia. Are o capacitate instalată de 920 MW generată din energie gaz. Este operată de PT. PJB.

Capacitate
920 MW
Anul Punerii in Functiune
2000

26 ani vechime

Proprietar
PT. PJB
Locatie
-6.0867°, 106.9987°

Indonezia, Asia

Locatie

Coordonate:: -6.086700, 106.998700
Deschide in Google Maps
Carbon Footprint490 g CO₂/kWh
Annual CO₂
1.78 Mt
3627 GWh/year × 490 g/kWh
Cumulative CO₂
46.20 Mt
Over 26 years of operation
Closing Soon
2030
4 years remaining
Annual emissions equivalent to
386.3K
cars per year
236.9K
homes per year
80.8M
trees to offset

Estimates based on Gas emission factor (490 g CO₂/kWh) and capacity factor (45%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.

Detalii Tehnice

Tip Combustibil Principal
Gas
Sursa de Energie
Neregenerabila
Tara
Indonezia
Continent
Asia
Sursa Datelor
Baza de Date Globala a Centralelor Electrice

IndoneziaProfil Energetic

297
Total Centrale
108.2 GW
Capacitate Totala
GasCoalHydroGeothermal
Cele Mai Bune Combustibile

Utilizarea gazului ca sursă de energie în sectorul energetic

Gazul natural reprezintă una dintre cele mai importante surse de energie utilizate la nivel global, având un rol esențial în generarea de electricitate și în alimentarea sectorului energetic. Această resursă fosilă, compusă în principal din metan, este utilizată atât în centrale electrice, cât și în procese industriale, datorită eficienței sale energetice și emisiilor reduse de dioxid de carbon comparativ cu alte surse de combustibil fosil, precum cărbunele sau petrolul.

Vedeti Date Incorecte sau Lipsa?

Ajutati-ne sa imbunatatim baza de date raportand orice corectii sau actualizari. Contributia dvs. ajuta la mentinerea datelor noastre globale despre centrale electrice corecte si actualizate.