Siwa - Wasit Electricity Station— 1.205 MW Gás Natural
The سيوا - محطة كهرباء واسط power plant, located in the United Arab Emirates, serves as a critical component in the nation’s energy framework. With a capacity of 1205 MW, this gas-powered facility is operated by the Sharjah Electricity and Water Authority, playing a significant role in fulfilling the energy demands of the UAE’s rapidly growing population and industrial sectors. Utilizing state-of-the-art gas turbine technology, the plant efficiently converts natural gas into electricity, providing a reliable and flexible power generation solution. The geographical coordinates of the plant, 25.3726° N latitude and 55.4606° E longitude, situate it within an area that is pivotal for energy distribution across the Emirates. The strategic location enhances its ability to support the local grid, ensuring that both residential and commercial users have access to consistent energy supply. As the UAE strives to diversify its energy mix, this power generation facility underscores the important balance of natural gas in the region's energy policy, which aims to combine traditional energy sources with investments in renewable technology. The operational context of the سيوا - محطة كهرباء واسط power plant reflects the UAE's commitment to energy security and sustainability. As the country moves towards its Vision 2021 objectives, which include increasing the share of clean energy in the national mix, facilities like this play an essential role in bridging the gap between current energy needs and future sustainability goals. Overall, the سيوا - محطة كهرباء واسط power plant exemplifies the UAE's strategic approach to energy generation, underlining the importance of gas power in the context of a transitioning energy landscape.
1.21 GW
13 anos de idade
Emirados Árabes Unidos, Asia
- 27.ª maior entre as 81 usinas de Emirados Árabes Unidos
- N.º 1.866 no mundo por capacidade instalada
- N.º 525 de 5.146 usinas de Gás Natural no mundo
- 1,28% da capacidade instalada de Emirados Árabes Unidos
13 anos em operação
Média da frota de Gás Natural: 26,9 anos
Sharjah Electricity and Water Authority opera 5 usinas totalizando 2.414 MW
49 usinas num raio de 100 km, 55.410 MW no total
Fonte: OpenStreetMap
Localização
Estimativas baseadas no fator de emissão de Gas (490 g CO₂/kWh) e no fator de capacidade (45%). As emissões reais podem variar de acordo com as condições de operação, a eficiência e a qualidade do combustível.
Detalhes Técnicos
- Tipo de Combustível Principal
- Gas
- Fonte de Energia
- Não Renovável
- País
Emirados Árabes Unidos- Continente
- Asia
- Fonte de Dados
- Banco de Dados Global de Usinas de Energia
Emirados Árabes Unidos — Perfil de Energia
Usinas Próximas
Vê Dados Incorretos ou Faltantes?
Ajude-nos a melhorar nosso banco de dados reportando quaisquer correções ou atualizações. Sua contribuição ajuda a manter nossos dados globais de usinas de energia precisos e atualizados.