Elektrocieplownia GIGA— 6 MW Carvão
Elektrociepłownia GIGA is a 6 MW coal power plant in Poland, operated by Dalkia Term since 2013. Ranked #107 of 124 coal plants in Poland, it contributes 0.01% of the country's total coal capacity of 62,066 MW. The largest coal plant in Poland is Bełchatów at 5,472 MW, making Elektrociepłownia GIGA 912 times smaller. Nearby plants include Elektrociepłownia Lublin Wrotków (231 MW, Gas), EC Lublin Wrotków (231 MW, Gas), and FW Lubartów (48 MW, Wind). The facility is located in the Lublin Voivodeship, approximately 150 km from Warsaw.
Polônia, Europe
- 223.ª maior entre as 318 usinas de Polônia
- N.º 27.330 no mundo por capacidade instalada
- N.º 2.747 de 2.793 usinas de Carvão no mundo
- 0,01% da capacidade instalada de Polônia
Dalkia Term opera 1 usinas totalizando 6 MW
15 usinas num raio de 100 km, 7.595 MW no total
Fonte: OpenStreetMap
Localização
Estimativas baseadas no fator de emissão de Coal (820 g CO₂/kWh) e no fator de capacidade (55%). As emissões reais podem variar de acordo com as condições de operação, a eficiência e a qualidade do combustível.
Detalhes Técnicos
- Tipo de Combustível Principal
- Coal
- Fonte de Energia
- Não Renovável
- País
Polônia- Continente
- Europe
- Fonte de Dados
- Banco de Dados Global de Usinas de Energia
Polônia — Perfil de Energia
Usinas Próximas
Vê Dados Incorretos ou Faltantes?
Ajude-nos a melhorar nosso banco de dados reportando quaisquer correções ou atualizações. Sua contribuição ajuda a manter nossos dados globais de usinas de energia precisos e atualizados.