GAEC de la Croisiere— 0,25 MW Biomassa
GAEC de la Croisière is a 0.25 MW biomass power plant in France, commissioned in 2017. It is part of a biomass sector that includes 163 plants with a total capacity of 1,053 MW, contributing 0.02% of this capacity. Ranked #137 of 163 biomass plants in France, it is considerably smaller than the largest biomass plant, Port-Est bioenergy power plant, which has a capacity of 210 MW, making GAEC de la Croisière 840 times smaller. Nearby plants include Fierville-Bray (20 MW, Wind), Juillé (10.8 MW, Wind), and Aubigny (10.5 MW, Wind). The plant is located in the Normandy region, approximately 60 km from the city of Caen.
9 anos de idade
França, Europe
- 2.141.ª maior entre as 2.195 usinas de França
- N.º 38.562 no mundo por capacidade instalada
- N.º 1.445 de 1.487 usinas de Biomassa no mundo
9 anos em operação
Média da frota de Biomassa: 20,5 anos
89 usinas num raio de 100 km, 1.120 MW no total
Fonte: OpenStreetMap
Localização
Estimativas baseadas no fator de emissão de Biomass (230 g CO₂/kWh) e no fator de capacidade (65%). As emissões reais podem variar de acordo com as condições de operação, a eficiência e a qualidade do combustível.
Detalhes Técnicos
- Tipo de Combustível Principal
- Biomass
- Fonte de Energia
- Renovável
- País
França- Continente
- Europe
- Fonte de Dados
- Banco de Dados Global de Usinas de Energia
França — Perfil de Energia
Usinas Próximas
Vê Dados Incorretos ou Faltantes?
Ajude-nos a melhorar nosso banco de dados reportando quaisquer correções ou atualizações. Sua contribuição ajuda a manter nossos dados globais de usinas de energia precisos e atualizados.