Ranked as the 50th largest power generation facility in the United Arab Emirates, the Phase 4 - Parabolic Trough 2 stands out as a significant contributor to the nation's solar energy landscape, boasting a capacity of 200 MW. This facility is particularly notable as the 7th largest solar plant among 22 solar installations in the country, representing a modest but meaningful 0.21% of the UAE's total capacity of 97,291 MW. The UAE's energy profile is predominantly gas-based, with natural gas dominating its energy mix, which highlights the importance of diversifying into renewable sources like solar. The Parabolic Trough 2 utilizes advanced solar thermal technology, specifically parabolic trough collectors that concentrate sunlight to produce steam, which then drives a turbine to generate electricity. This method not only enhances efficiency but also aligns with global trends toward sustainable energy practices. Located within a vibrant energy cluster, the plant is surrounded by several significant gas-powered facilities, including the Jebel Ali Power Station, which has a capacity of 9,547 MW, and the Jebel Ali Power and Desalination Plant, with 8,694.1 MW. These nearby plants underscore the regional reliance on fossil fuels, making Phase 4 - Parabolic Trough 2 a critical player in the transition to a more sustainable energy future. Its proximity to the Mohammed bin Rashid Al Maktoum Solar Park, the largest solar facility in the region with a capacity of 2,427 MW, further emphasizes this plant's role in the UAE's ambitious renewable energy goals. Operated by a consortium focused on advancing solar technology, this facility was commissioned to bolster the UAE's energy diversification strategy. Looking ahead, the Phase 4 - Parabolic Trough 2 is poised to play an essential role in the UAE's efforts to reduce carbon emissions and enhance energy security, contributing to the broader global shift towards clean energy solutions.

Capacidad
200 MW
Año de Puesta en Servicio
2013

13 años de antigüedad

Propietario
Abu Dhabi Water and Electricity Authority
Ubicación
24.7370°, 55.4622°

Emiratos Árabes Unidos, Asia

Contexto y clasificación
  • 50.ª mayor de las 81 centrales de Emiratos Árabes Unidos
  • N.º 7393 del mundo por potencia instalada
  • N.º 123 de 11.042 centrales de Solar en el mundo
  • 0,21% de la potencia instalada de Emiratos Árabes Unidos
Antigüedad y comparación de la flota

13 años en operación

Media de la flota de Solar: 10,4 años

Cartera del operador

Abu Dhabi Water and Electricity Authority opera 9 centrales con un total de 8266 MW

Densidad regional
Procedencia de los datos

Ubicación

Coordenadas:: 24.736951, 55.462234
Abrir en Google Maps
Huella de Carbono

Cero Emisiones Directas

Phase 4 - Parabolic Trough 2 es una central eléctrica solar que produce aproximadamente 315 GWh de electricidad limpia al año, sin emisiones directas de CO₂ durante su funcionamiento.

Emisiones del ciclo de vida: ~41 g CO₂/kWh (fabricación, transporte, desmantelamiento)

Detalles Técnicos

Tipo de Combustible Principal
Solar
Fuente de Energía
Renovable
País
Emiratos Árabes Unidos
Continente
Asia
Fuente de Datos
Base de Datos Global de Centrales Eléctricas

Emiratos Árabes UnidosPerfil Energético

81
Total de Plantas
93.9 GW
Capacidad Total
GasNuclearSolar
Principales Combustibles

¿Ves Datos Incorrectos o Faltantes?

Ayúdanos a mejorar nuestra base de datos reportando cualquier corrección o actualización. Tu contribución ayuda a mantener nuestros datos globales de centrales eléctricas precisos y actualizados.