Phase 1— 13 MW Solar
Phase 1 is a 13 MW solar power plant in the United Arab Emirates, operated by Dubai Electricity & Water Authority (DEWA) since its commissioning. Ranked #13 of 22 solar plants in the United Arab Emirates, this facility contributes 0.17% of the country's total solar capacity of 7,825 MW. The largest solar plant in the United Arab Emirates is مجمع محمد بن راشد آل مكتوم للطاقة الشمسية at 2,427 MW, making Phase 1 186 times smaller. Nearby plants include محطة كهرباء جبل علي (Gas, 9,547 MW), Jebel Ali Power and Desalination Plant (Gas, 8,694.1 MW), and Emirates Global Aluminium Jebel Ali power plant (Gas, 2,950 MW). The facility is located in Dubai, approximately 35 km southwest of the city center.
5 años de antigüedad
Emiratos Árabes Unidos, Asia
- 62.ª mayor de las 81 centrales de Emiratos Árabes Unidos
- N.º 22.124 del mundo por potencia instalada
- N.º 3258 de 11.039 centrales de Solar en el mundo
- 0,01% de la potencia instalada de Emiratos Árabes Unidos
5 años en operación
Media de la flota de Solar: 10,4 años
Dubai Electricity & Water Authority (DEWA) opera 1 centrales con un total de 13 MW
51 centrales en un radio de 100 km, 64.147 MW en total
Fuente: OpenStreetMap
Ubicación
Cero Emisiones Directas
Phase 1 es una central eléctrica solar que produce aproximadamente 20 GWh de electricidad limpia al año, sin emisiones directas de CO₂ durante su funcionamiento.
Emisiones del ciclo de vida: ~41 g CO₂/kWh (fabricación, transporte, desmantelamiento)
Detalles Técnicos
- Tipo de Combustible Principal
- Solar
- Fuente de Energía
- Renovable
- País
Emiratos Árabes Unidos- Continente
- Asia
- Fuente de Datos
- Base de Datos Global de Centrales Eléctricas
Emiratos Árabes Unidos — Perfil Energético
Plantas de Energía Cercanas
¿Ves Datos Incorrectos o Faltantes?
Ayúdanos a mejorar nuestra base de datos reportando cualquier corrección o actualización. Tu contribución ayuda a mantener nuestros datos globales de centrales eléctricas precisos y actualizados.