Kargi Dam— 97,4 MW Hidroeléctrica
Kargı Dam is a 97.4 MW hydro power plant in Turkey, commissioned in 2010. Ranked #58 of 139 hydro plants in Turkey, it represents 0.43% of the country's total hydro capacity of 22,862 MW. The largest hydro plant in Turkey is Atatürk Dam at 2,400 MW, making Kargı Dam 24.6 times smaller. Nearby plants include Çayırhan power station (620 MW, Coal), Çayırhan Termik Santrali (620 MW, Coal), and Yunus Emre Power Station (290 MW, Coal). The facility is located in Kütahya Province, approximately 250 km from the nearest major city, Eskişehir.
16 años de antigüedad
Turquía, Asia
- 143.ª mayor de las 368 centrales de Turquía
- N.º 10.475 del mundo por potencia instalada
- N.º 2355 de 8493 centrales de Hidroeléctrica en el mundo
- 0,1% de la potencia instalada de Turquía
16 años en operación
Media de la flota de Hidroeléctrica: 42,1 años
State Hydraulic Works (DSI) opera 41 centrales con un total de 9832 MW
12 centrales en un radio de 100 km, 4815 MW en total
Fuente: Wikidata
Ubicación
Cero Emisiones Directas
Kargi Dam es una central eléctrica hydro que produce aproximadamente 341 GWh de electricidad limpia al año, sin emisiones directas de CO₂ durante su funcionamiento.
Emisiones del ciclo de vida: ~24 g CO₂/kWh (fabricación, transporte, desmantelamiento)
Detalles Técnicos
- Tipo de Combustible Principal
- Hydro
- Fuente de Energía
- Renovable
- País
Turquía- Continente
- Asia
- Fuente de Datos
- Base de Datos Global de Centrales Eléctricas
Turquía — Perfil Energético
Plantas de Energía Cercanas
¿Ves Datos Incorrectos o Faltantes?
Ayúdanos a mejorar nuestra base de datos reportando cualquier corrección o actualización. Tu contribución ayuda a mantener nuestros datos globales de centrales eléctricas precisos y actualizados.