Wlingi Dam is a 53.62 MW hydro power plant in Indonesia, operated by PT PLN Nusantara Power since 1975. Ranked #30 of 66 hydro plants in Indonesia. Its 53.62 MW represents 0.68% of Indonesia's 7,874 MW total hydro capacity. The largest hydro plant in Indonesia is Upper Cisokan Pumped Storage Power Plant at 1,040 MW, making Wlingi Dam 19.4 times smaller. Nearby plants within 50 km include Sutami / Karangkates - Brantas (105 MW, Hydro), PLTA Sutami (103 MW, Hydro), and Karangkates Hydroelectric Power Plant (103 MW, Hydro). The facility is located in East Java, approximately 120 km southwest of Surabaya.
51 años de antigüedad
Indonesia, Asia
- 180.ª mayor de las 297 centrales de Indonesia
- N.º 12.850 del mundo por potencia instalada
- N.º 3106 de 8493 centrales de Hidroeléctrica en el mundo
- 0,05% de la potencia instalada de Indonesia
51 años en operación
Media de la flota de Hidroeléctrica: 42,1 años
PT PLN Nusantara Power opera 8 centrales con un total de 8943 MW
20 centrales en un radio de 100 km, 2453 MW en total
Fuente: Wikidata
Ubicación
Cero Emisiones Directas
Wlingi Dam es una central eléctrica hydro que produce aproximadamente 188 GWh de electricidad limpia al año, sin emisiones directas de CO₂ durante su funcionamiento.
Emisiones del ciclo de vida: ~24 g CO₂/kWh (fabricación, transporte, desmantelamiento)
Detalles Técnicos
- Tipo de Combustible Principal
- Hydro
- Fuente de Energía
- Renovable
- País
Indonesia- Continente
- Asia
- Fuente de Datos
- Base de Datos Global de Centrales Eléctricas
Indonesia — Perfil Energético
Plantas de Energía Cercanas
¿Ves Datos Incorrectos o Faltantes?
Ayúdanos a mejorar nuestra base de datos reportando cualquier corrección o actualización. Tu contribución ayuda a mantener nuestros datos globales de centrales eléctricas precisos y actualizados.