World Power Plants

Hydroelectric Power Plants in Uganda

6 plants · 667 MW total installed capacity

#Power plantCapacity (MW)Year
1Bujagali Falls2502012
2Kiira2052003
3Narubale1802015
4Bugoye112012
5Mubuku-310.52019
6Ishasha River102015

Frequently Asked Questions: Hydroelectric Power in Uganda

How many Hydroelectric power plants are in Uganda?

Uganda has 6 Hydroelectric power plants with a combined installed capacity of 667 MW.

What is the largest Hydroelectric power plant in Uganda?

Bujagali Falls is the largest Hydroelectric power plant in Uganda, with an installed capacity of 250 MW, commissioned in 2012.

What is the newest Hydroelectric power plant in Uganda?

The most recently commissioned Hydroelectric power plant in Uganda is Mubuku-3 (2019).

What is the average size of a Hydroelectric power plant in Uganda?

The average Hydroelectric power plant in Uganda has a capacity of 111 MW.