Silver State Solar Power North— 52 MW Solar
Silver State Solar Power North is a 52 MW solar power plant in the United States, operated by Silver State Solar Power North LLC and commissioned in 2012. Ranked #181 of 3,289 solar plants in the United States. Its 52 MW represents 0.13% of the country's total solar capacity of 40,823 MW. The largest solar plant in the United States is the Sandstone Solar Energy Project at 2,000 MW, making Silver State 38.5 times smaller. Nearby plants within 50 km include Edward W. Clark Generating Station (1,375.6 MW, Gas) and Clark (NVE) (1,375.6 MW, Gas). The facility is located in Nevada, approximately 100 km from Las Vegas.
14 years old
United States of America, North America
- 2,884. largest of 10,098 plants in United States of America
- #12,924 worldwide by installed capacity
- #797 of 11,042 Solar plants worldwide
14 years in operation
Solar fleet average: 10.4 years
Silver State Solar Power North LLC operates 1 plants totalling 52 MW
53 plants within 100 km, 14,810 MW combined
Location
Zero Direct Emissions
Silver State Solar Power North is a solar power plant producing approximately 82 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~41 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Solar
- Energy Source
- Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.