World Power PlantsWorld Power Plants

Seymour Hills Wind Project LLC30.2 MW Wind

WindRenewable

Seymour Hills Wind Project LLC is a 30.2 MW wind power plant in the United States, operated by Engie North America since 2019. Ranked #704 of 1142 wind plants in the United States. Its 30.2 MW accounts for 0.03% of the United States' total wind capacity of 105,842 MW. The largest wind plant in the United States is Alta Wind VIII at 1,547 MW, making Seymour Hills 51.2 times smaller. Nearby plants include Willow Springs Wind Farm (250 MW, Wind), Horse Creek Wind Farm (230 MW, Wind), and Green Pastures Wind I (150 MW, Wind). The facility is located in Texas, approximately 80 km from Abilene.

Capacity
30.2 MW
Commissioning Year
2019

7 years old

Owner
Engie North America
Location
33.5782°, -99.1921°

United States of America, North America

Location
Coordinates:: 33.578200, -99.192100
Open in Google Maps
Technical Details
Primary Fuel Type
Wind
Energy Source
Renewable
Country
United States of America
Continent
North America
Data Source
Global Power Plant Database
United States of AmericaEnergy Profile
10,047
Total Plants
1386.4 GW
Total Capacity
GasCoalNuclearHydro
Top Fuels
Understanding Wind Power Generation: A Comprehensive Overview

Wind power generation harnesses the kinetic energy of wind to produce electricity, making it one of the fastest-growing renewable energy sources globally. This process begins with wind turbines, which consist of large blades mounted on a tower. As the wind blows, it causes the blades to rotate, transforming the wind's kinetic energy into mechanical energy. This mechanical energy is then converted into electrical energy through a generator connected to the turbine. The efficiency of wind turbines has significantly improved over the past decades, with modern designs capable of generating power even at low wind speeds.

See Incorrect or Missing Data?

Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.