Rio Bravo Hydro Project— 14 MW Hydroelectric
Rio Bravo Hydro Project is a 14 MW hydroelectric power plant in the United States, operated by Olcese Water District since 1989. Ranked #576 of 1469 hydro plants in the United States. Its 14 MW represents 0.01% of the country's total hydro capacity of 117,947 MW. The largest hydro plant in the United States is Grand Coulee Dam at 6,809 MW, making Rio Bravo 486 times smaller. Nearby plants within 50 km include Sycamore Cogeneration (300 MW, Gas), Kern River Cogeneration (300 MW, Gas), and Alta Wind XI (90 MW, Wind). The facility is located in California, approximately 150 km north of Los Angeles.
37 years old
United States of America, North America
- 4,407. largest of 10,098 plants in United States of America
- #21,743 worldwide by installed capacity
- #5,010 of 8,493 Hydroelectric plants worldwide
37 years in operation
Hydroelectric fleet average: 42.1 years
Olcese Water District operates 1 plants totalling 14 MW
257 plants within 100 km, 17,612 MW combined
Location
Zero Direct Emissions
Rio Bravo Hydro Project is a hydro power plant producing approximately 49 GWh of clean electricity per year with zero direct CO₂ emissions during operation.
Lifecycle emissions: ~24 g CO₂/kWh (manufacturing, transport, decommissioning)
Technical Details
- Primary Fuel Type
- Hydro
- Energy Source
- Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.