POET Biorefining - Leipsic LLC— 3.5 MW Natural Gas
POET Biorefining - Leipsic LLC is a 3.5 MW gas power plant in the United States, operated by POET Biorefining - Leipsic LLC since 2017. Ranked #1713 of 1883 gas plants in the United States. Its 3.5 MW contributes to the United States' total gas capacity of 592,244 MW. The largest gas plant in the United States is the West County Energy Center at 4,263 MW, making POET Biorefining - Leipsic LLC 1212 times smaller. Nearby plants within 50 km include Richland (450 MW, Gas), Hog Creek Wind Project (66 MW, Wind), and Bowling Green Generating Station (49.5 MW, Gas). The facility is located in Ohio, approximately 40 km south of Toledo.
9 years old
United States of America, North America
- 6,957. largest of 10,098 plants in United States of America
- #31,512 worldwide by installed capacity
- #4,824 of 5,146 Natural Gas plants worldwide
9 years in operation
Natural Gas fleet average: 26.9 years
POET Biorefining - Leipsic LLC operates 1 plants totalling 4 MW
66 plants within 100 km, 7,301 MW combined
Nearest plant: Whirlpool Corporation - Ottawa Wind Farm (14.1 km)
Location
Estimates based on Gas emission factor (490 g CO₂/kWh) and capacity factor (45%). Actual emissions may vary based on operating conditions, efficiency, and fuel quality.
Technical Details
- Primary Fuel Type
- Gas
- Energy Source
- Non-Renewable
- Country
United States of America- Continent
- North America
- Data Source
- Global Power Plant Database
United States of America — Energy Profile
Nearby Power Plants
See Incorrect or Missing Data?
Help us improve our database by reporting any corrections or updates. Your contribution helps keep our global power plant data accurate and up-to-date.